New Search

If you are not happy with the results below please do another search

410 search results for: grp

11

GRP pipes are designed for generations.

A generations-long, low-maintenance service life: It’s a promising claim that Amiblu makes about their GRP products. Our former Amiblu PDM Högni Jónsson tells us why we can confidently stand by our claim.

26

GRP pipes in excellent condition after 33 years in seawater

In 1975, 1500 m of Flowtite pipes were installed as subaqueous marine outfall of the Enga wastewater treatment plant in the Norwegian town of Sandefjord. In 2008, one pipe section was brought ashore to evaluate its condition. The result: A fully functional pipe with very good mechanical properties. The outfall of the Enga wastewater treatment […]

28

GRP pipes help modernize combined sewer system in France

Hobas and Flowtite GRP pipes were installed as part of a new storage system in the city of Clermont-Ferrand. They ensure that the combined sewage is reliably discharged without harming the environment.   The French city of Clermont-Ferrand and its metropolitan area are mainly equipped with combined sewer networks that transport both stormwater and wastewater. […]

29

From sea to peak: Flowtite GRP penstock for Breivikelva hydropower plant

1026 m Flowtite GRP pressure pipes DN 1200 are currently being installed as part of the penstock for the new hydropower plant Breivikelva in northern Norway. The challenging geographic conditions called for a special multi-stage delivery approach via ship, helicopter, and trucks. The municipality of Beiarn is located just north of the Arctic Circle, in […]

44

Turning ocean into drinking water with Amiblu GRP

The newly built Ensenada Desalination Plant provides valuable drinking water for the inhabitants of the Mexican coastal city. Amiblu designed, supplied and installed the required piping for this sophisticated application and fully supported the client with thorough analyses, performance tests, and customized accessories.   250 liters per second, 21.6 million liters per day: That’s the […]

46

GRP sewer pipes installed in Luxembourgian nature reserve

For a new sewer main in the municipality of Bettembourg, Flowtite GRP pipes DN 1200 and OD 1280 were installed in open trench and jacked underneath a highway. In order to restrict the flow to the wastewater treatment plant Peppange and allow for a temporary storage of the accumulating water volume, the municipality of Bettembourg […]

120

Amiblu GRP pipes for stormwater drainage system at Kraków Airport

Two powerful brands make an even more powerful solution: A combination of filament wound Flowtite and centrifugally cast Hobas pipes by Amiblu is being installed to build a new, highly efficient stormwater sewer system for Kraków Airport. The new underground infrastructure is an important cornerstone for the airport’s increasing importance in international aviation. Since its […]

124

Hobas GRP Cooling Water Pipeline for voestalpine Steel Plant

For the voestalpine AG in Donawitz, a more than 100 m long Hobas GRP Pressure Pipeline De 1720 has been installed by means of curved jacking. Despite challenging circumstances, the installation has been successfully completed within 2 months only.   An internationally renowned steel company, voestalpine places highest demands not only on the company’s products, […]

126

Sewer line brought back to service with non-circular Hobas GRP Profiles

When in 2015, an old non-circular concrete sewer had to be rehabilitated in Groningen in the northern part of the Netherlands, Hobas was brought into play. Within only three weeks and under challenging circumstances, the sewer line was successfully renovated with egg-shaped GRP profiles. Petrus Campersingel is a highly frequented road in the Dutch city […]

127

Record Size Microtunnelling with HOBAS CC-GRP Pipes De 3270 in Poland

In the Polish capital Warsaw, a 3.2 km long HOBAS Pipeline De 3270 has been microtunnelled on the left bank of the Vistula River to transport sewage and rainwater from the central and northern districts of Warsaw to the wastewater treatment plant (WWTP) Czajka. The installation involved the largest-diameter microtunnelled curve ever realized with a […]

134

HOBAS GRP Culvert Under the Oklahoma River

In Oklahoma City, HOBAS GRP Pipes in various diameters were successfully installed in open trench under challenging conditions. With 1,600 km² and more than 1.2 million inhabitants, Oklahoma City is the most highly populated city in the state of Oklahoma. The waterway which flows through the City and is now known as “Oklahoma River” was […]

135

Hobas GRP for Australia’s Largest Ever Pressure Jacking Project in Gold Coast

Australia’s Gold Coast, located about one hour’s drive south of Brisbane, expects heavy annual rain falls during their “wet season”. This posed problems on the stormwater and sewage systems of the area since the pumping station (PS) B47 wastewater catchment flows are pumped to Elanora Sewage Treatment Plant (STP). With the steady population growth in […]

136

Hobas GRP Pipes Jacked under Russian Railway

Only few pipe producers offer a broad range of technical solutions and are authorized to install their products beneath Russian rail tracks. In order to receive approval, the products need to comply with the requirements and standards of the Russian Railways (RŽD), worldwide one of the three largest rail companies. Safety is absolutely essential.   […]

137

Non-circular GRP Pipes Renovate Aged Sewer Networks in Belgium

15 km of non-circular GRP pipes 500/1000 to 1380/2070 mm were installed to rehabilitate the sewer networks of the Brussels-Capital Region.   The Brussels-Capital Region comprises 19 municipalities and is home to around 1.2 million inhabitants. The region’s sewer network was built a century ago and is already in a rather poor condition. The more […]

139

HOBAS CC-GRP Tank for potable water and fire fighting water installed in Látkovce, SK

In 2012, the operators of a new agritourism business in the Slovakian town of Látkovce were in need of a tank with two 15 m³ chambers, which should be used as potable and fire fighting water reservoir. The required product should be of high quality and quick and easy to install. Due to the project’s […]

141

HOBAS CC-GRP Pipes Prove their Worth in Bulgarian Hydropower Plant Kalin

Hydropower plants in Bulgaria play an important role in covering peak consumption. Two particularly interesting ones have been realized with HOBAS Pipes – and they are doing an excellent job in providing the country with clean energy. , The name “Rila” means “well-watered mountain”, which is definitely a suitable name for the highest mountain range of […]

143

Open Trench Projects on the Rails with HOBAS GRP Pipes

For safety reasons, the Hungarian public railway company MÁV has special requirements for structures to be installed beneath railways. The only traditional pipe solution and material used to be double steel pipes with grouted annular space. In 2002, HOBAS obtained the individual permit from MÁV for a jacking project in Aszófő with 18 meters De […]

145

HOBAS GRP Pipes for Hydropower Plants in the Czech Republic

In 2011, HOBAS Czech Republic started cooperating with Kredit Centrum s.r.o., a Czech company that operates several hydropower plants throughout the country. That same year this partnership resulted in a first order: HOBAS Pipes were installed for two hydropower plants in the town Tanvald. Working very closely with the designers of the projects the technical […]

146

Auger Boring Small Diameter HOBAS GRP Pipe Beneath Dutch Railway

In 2010, due to the establishment of new industrial plants in Rotterdam’s harbor, a new 10,000 volt power line became necessary for sufficient power supply. Since the railway network’s safety measures prerequisite a protective pipe for all pressure lines and cables running beneath the railway, ProRail, the company in charge of the Dutch railway network, […]

147

Gas Lines in the Czech Republic on the Safe Side with HOBAS GRP

A special medium requires special treatment. Gas for instance requires special caution and safety measures. Requirements which are perfectly fulfilled by HOBAS GRP Protective Pipe Systems: They ensure tightness; have a high load capacity and offer a long service life. And, as projects in Poland and in the Czech Republic show, they can be installed […]

148

HOBAS GRP Pipes and Manholes installed for drainage of JadeWeserPort in Wilhelmshaven, Germany

International merchant shipping, especially container shipping is rapidly growing and will continue to do so over the next years. In order to account for this development and to allow for the access of ever-larger container ships with deep draughts, the JadeWeserPort in Wilhelmshaven was built between 2008 and 2012. Located at the Jade Bight on […]

149

HOBAS GRP Cooling Water Pipes for Combined Cycle Power Plant

In May 2011 the turnkey EPC (Engineering, Procurement and Construction) contracting partner, German Siemens AG, assigned HOBAS for the design, production, delivery and installation of an underground cooling water line for one of the world’s most modern combined-cycle power plants (CCPP). Erected next to Statkraft’s existing power plant in Knapsack nearby Cologne in Germany the […]

152

GRP Shafts for Deep Tunnels in Minneapolis

On two recent large diameter tunnels in the Minneapolis-St. Paul area, Wood- bury L73 and Victoria Intercept Sewer Tunnel, HOBAS GRP was the material of choice for both the tunnel and the manhole risers, says Vince Paparozzi, area sales manager for HOBAS Pipe USA. “They were about 23 m deep for Woodbury and 30.5 m […]

153

Microtunneling HOBAS GRP Culverts under the E65 Railway Line in Poland

The construction of HOBAS Culverts beneath the railway line in the area of Ciechanów was carried out as part of the nationwide project “Modernization of E65 Warsaw – Gdynia Railway Line”. The main aims of this extensive project were to improve travel comfort, increase safety and shorten the journey by 27 minutes on this 103-km-long […]

154

HOBAS GRP Jacking Pipes Under Railway Track in Třinec, CZ

Pipelines crossing traffic routes, streams or buildings pose a big challenge to contractors. Detours and the therefore required pipeline extension would in many cases increase costs considerably so that they could sometimes not be implemented. A common solution for this problem is therefore trenchless installation with HOBAS Pipes – such as was the case in […]

156

GRP Pipeline for Drainage and Sewer System in Zadar with 202 Shafts

A thorough technical analysis and comparison of several contemplable pipe materials and manufacturers was conducted to find the “Swissarmy-knife” pipe solution that would meet several requirements and suit all installation conditions – and HOBAS became the supplier of choice. The GRP products’ excellent properties such as the long product life, leak-tightness, corrosion and abrasion resistance, […]

157

HOBAS GRP Potable Water Tank

One would hardly suspect a HOBAS GRP Potable Water Tank under ones feet once it has been installed, covered and greened to suit its natural surroundings. The door to the utility chamber may be the only evidence and even this is often framed with natural stones to camouflage the structure. Not so in Czech Republic, […]

160

Trenchless Installation of Trunk Interceptor with HOBAS CC-GRP Pipes in Ohio, US

The wastewater system of the city Marysville in Ohio serves its growing population and several major industrial firms including the Nestlé Corporation, Goodyear Tire & Rubber Co., and Honda. To meet future wastewater requirements, reduce maintenance costs, and increase the reliability of the system, the city decided to build a new water reclamation facility in […]

165

GRP Pipes Slipline Antiquated Wastewater Interceptor in Minnesota

The interceptor had no parallel pipe to redirect flow. Therefore, the chosen repair method needed to be implemented “in the wet” with wastewater flowing in the pipe. That left only two possible repair methods: • Crown Repair involving excavating the entire length of the pipe, removing the brick arch and reconstructing the crown using cast-in-place […]

166

French Highway Secured in Tailor-Made HOBAS GRP Pipes

Moreover, rehabilitation involves a group of not less than 11 large-scale hydraulic constructions, 9 of which were originally elliptical, one was circular but strongly buckled, and one was in the shape of an arch. The total length of installed pipe adds up to 685m. APRR first invited tenders that HOBAS France approached. An overall solution […]

170

Replacement of old reinforced concrete sewer with GRP pipes in Transylvania

It seemed that under these conditions, the town’s original, relatively heavy reinforced concrete sewer was no longer suitable. Soil instabilities under slopes and narrow streets lined with historical 12th century buildings such as the turret clock and Vlad Dracula’s birth place, to mention only a few, asked for a highly durable lightweight product, that is […]

171

Revaluation of Wastewater System in Bratislava with GRP Pipes

The Water Company of Bratislava, who was in charge of finding the optimal solution to the results of revaluation, decided to reconstruct and to extend the existing waste water system. They proposed to have the old DN 2600/1650 concrete pipeline cleaned and recommended its rehabilitation with HOBAS® CC-GRP SewerLine® Systems DN 1400. HOBAS products were […]

172

HOBAS GRP pipes replace reinforced concrete pipes

The contractor was highly impressed by the ease with which HOBAS Pipes could be assembled thanks to the push-to-fit HOBAS Couplings pre-mounted on one end of each Pipe. In fact, the pipe installation proceeded faster than the trench preparation. Since the high quality of pipe material alone does not ensure an optimal quality of the […]

175

Rehabilitation of a Double, Gravity Potable Water Line in Budapest with CC-GRP HOBAS Pipes and HOBAS NC Profiles 1500/1500 mm

Hungary’s capital Budapest is located on the Danube and has almost 2 million inhabitants. To secure the supply of clean and healthy potable water, some of the more than one hundred years old pipelines were relined and renewed with circular HOBAS CC-GRP Pipes. The old non-circular 1500/1500 mm concrete pipeline was built at the end […]

179

Microtunneling GRP Pipe Systems in the Emirates

The ground conditions were very poor and soil consisted of layered mudstone, gypsum and sandy-silt with a high ground water table. The total project was divided into several contracts, whereas the biggest part was realized by the local firm. This section consisted of approx. 24 km in a diameter range of DN 400 to 1800 […]

181

HOBAS GRP Protective Pipes for Heating Networks in Poland

Protective pipes from steel have long been the first choice in pre-insulated pipeline engineering. They are however vulnerable to corrosion, particularly stray current corrosion (SCC). HOBAS GRP Pipes present a remedy for this problem – the Polish heating company SPEC, for instance, has realized this and has been using GRP for over a decade.

182

Gas Lines in Poland on the Safe Side with HOBAS GRP

A special medium requires special treatment. Gas for instance requires special caution and safety measures. Requirements which are perfectly fulfilled by HOBAS GRP Protective Pipe Systems: They ensure tightness; have a high load capacity and offer a long service life. And, as projects in Poland and in the Czech Republic show, they can be installed […]

183

First Large-Scale Hobas GRP Jacking Project in the World

Hobas made its debut with centrifugally cast GRP jacking pipes in 1982. Before then, the pipes had only been used on some test construction sites in northern Germany for pushes of up to 50 meters. The world‘s first large and technically highly demanding jacking project with GRP products was undertaken at Hamburg‘s customs port. A […]

211

Bradford UK – Reinforcement of the Bradford Beck culvert with Amiblu NC Line

Bradford Metropolitan Council proposed plans to refurbish an existing building, located in Bradford City Centre. Beneath the building lies the culverted Bradford Beck which runs diagonally through the middle of the site. During the refurbishment of the existing structure, it came to light that there were several cast iron beams located within the Bradford Beck […]

216

Plovdiv is ready for the future – reconstruction of the sewer network in Bulgaria

The first dig of one of the largest construction sites in Plovdiv was made in November 2021 as a part of the Municipality Water Project. The construction activities include the reconstruction of the sewerage and water supply network on the boulevards “Danube” and “Brezovsko Shosse”. Amiblu pipes play a decisive role in the project: about […]

219

33 years of exposure to seawater

In 2008, after 33 years of exposure to seawater, a section of a Flowtite GRP pipe was brought ashore for analysis of its condition and mechanical properties. After cleaning parts of it, the pipe looked brand-new.

220

East Budleigh, UK – NC Line Culvert Rehabilitation

The village features a bypass
culvert, constructed in the 1970s.
For this project it was decided that lining with a structural GRP segment lining system offered the best solution and Amiblu‘s NC Line, non-circular GRP Structural Relining system was selected.

222

Maidstone, UK – NC Line Culvert Strengthening

Kent County Council‘s programme of planned highways maintenance works to be carried out during 2019 – 2021 included strengthening works to structures such as the Raigersfeld Culvert situated beneath the A20 Ashford Road, Maidstone, Kent. Following on from previous culvert rehabilitation works for Kent County Council, Steadline Ltd. were once again comissioned to make the […]

223

Sheffield, Waverley Pumping Station upgrade – Amiblu Jacking Pipes by Hobas

The former mining and steelworks site at Waverley in the City of Sheffield was chosen for regeneration with the creation of a new residential and commercial development. To accommodate for the increase in capacity, the local pumping station needed to be upgraded, along with almost 4,000 planned new homes, retail outlets and public amenities. To […]

224

Scotland, Balmoral Estates Hydro Energy with Flowtite pressure pipes

Hydropower supplies more than 70% of all renewable electricity worldwide. For over a century the UK has generated hydroeletric power by harnessing fast flowing water to turn turbines to generate electricity. In 1898 during the reign of Victoria, the first hydroelectric turbine was installed to provide electric light to Balmoral Castle, since then two further […]

227

Rury Hobas PU Line w projekcie budowy zbiornika Roztoki Bystrzyckie

System przelewowy suchego zbiornika przeciwpowodziowego Od tzw. powodzi tysiąclecia, która nawiedziła południową i zachodnią Polskę, Czechy, wschodnie Niemcy oraz Austrię, a także północno-zachodnią Słowację, minęło już ponad 20 lat. Przez ten czas, od 1997 r., w zakresie ochrony zrobiono wiele – ale nadal konieczne są inwestycje w rozwiązania mające na celu zmniejszenie kulminacji fal powodziowych oraz […]

257

Kent, Brewers Bridge, Culvert strengthening with Hobas relining pipes

Kent County Council‘s programme of planned highways maintenance works to be carried out during 2019 – 2021 included strengthening works to structures such as the Brewers Bridge Culvert in Worth, Kent.   Worth is a small picturesque village situated near Sandwich in East Kent which has a population of circa 1000 and a central conservation […]

258

Preston WwTW, resilient stormwater management with Flowtite biaxial & pressure pipes

During AMP 6 United Utilities invested £20m into Preston WwTW to improve performance and resilience. Flowtite GRP Biaxial and Pressure Pipes have been installed to assist with achieving project objectives.   Preston WwTW serves a population in excess of 250,000 within the Borough of Preston and the South Ribble Districts.  The Preston Storm Tank Project […]

260

Renovation of sewer system with Amiblu NC Line in Krakow

In Poland’s second largest city Krakow, an aged non-circular sewer was relined with 746 m of Amiblu NC Line pipes. The location close to a main artery and ongoing operations of the existing sewer line made the installation challenging.   The project “Water and sewage management in Kraków – stage V” is co-financed by the […]

261

Bournemouth, Braidley Road, deteriorated sewer restored preventing collapse with Flowtite relining pipes

The existing 1050 mm diameter PCC combined sewer running through Braidley Road in Bournemouth was found to be defective and with the surrounding ground conditions being very fine sand, it was imperative that the asset was structurally repaired before any further deterioration occurred risking a potential collapse leading to a sink hole opening up in […]

262

Bournemouth, Percy Road, deteriorated sewer restored preventing collapse with Flowtite relining pipes

A large 1.8 m ID tunnel runs through Bournemouth carrying the combined foul and surface water to the various sewage treatment works across the network. The local geology of the Bournemouth area consists mainly of fine sand. A defect was spotted in the road, which caused it to be closed and emergency works began to repair […]

263

East Anglia, H₂S corroded sewer restoration with Flowtite relining pipes

In the British city of Norwich, the life of a corroded sewer has been extended with Flowtite GRP relining pipes. Thanks to the innovative design and a collaborative approach, the initially estimated carbon emissions were reduced by 55 %.   Norwich’s main trunk sewer had been found to be in extremely poor structural condition: Hydrogen […]

264

Amiblu NC Line for combined sewer rehab in Hamburg

In Germany’s second largest city Hamburg, a sewer channel is called “Siel”. Hence the project name “Stammsiel Eilenau / Kuhmühlenstammsiel”, in the course of which a 1357 m long combined sewer channel was rehabilitated through relining of Amiblu NC Line pipe profiles. Reasons for the client Hamburger Stadtentwässerung to opt for Amiblu were the environmentally […]

266

Customized and leakproof: NC profiles reline blackwater sewer

In the north-Italian city of Piacenza, three different non-circular GRP pipe profiles by Amiblu (one egg profile, two mouth profiles) have been used for rehabilitating a number of old sewer channels with a total length of 589 m. The hydraulic and structural properties of the existing pipelines were no longer sufficient. The new NC pipes […]

267

West Midlands, Network Rail arch shaped culvert, structural reline with Amiblu NC Line

The culvert known to Network Rail as RBS2/57A Tipton, over which run two non-electrified tracks, is a 68 m long brick built arch construction with a constantly flowing water course running through it. Over time, the culvert had suffered wear and tear and required maintenance before it was too late and would need to be […]

268

Cooling water system by Amiblu for thermoelectric plants in Bolivia

In 2016, the Spanish construction company TSK was awarded one of the most important agreements in its history: Together with the German company Siemens, TSK was to build three thermoelectric plants located in the Bolivian cities of Santa Cruz, Tarija, and Cochabamba, which will increase the installed power in Bolivia by 50 %.   For […]

270

First CSO chamber on Austrian soil successfully installed

An Amiblu CSO chamber has recently been installed in the Austrian town of Mautern. The structure is more than 10 m long and consists of centrifugally cast Hobas GRP pipes with different diameters: A main pipe DN 1200, an overflow pipe DN 900, plus two manholes DN 800. Six integrated, self-cleaning screening elements (GRP bars) […]

271

Record sewer jacking with Flowtite pipes in Poznań

The condition of the existing sewer collector “Junikowski” in the Polish city of Poznań had deteriorated over the years. On the section from Samotna street to Głogowska street it could no longer handle the growing demands. Since an expansion was no option, it had to be renewed. Amiblu Poland produced and supplied the required pipes […]

273

Optimum solids retention with 190 m² Amiscreen

Eula is the name of a stream nearby the small town of Geithain in the German Free State of Saxony. During heavy rainfall, it kept filling up rather quickly with water entering from the overflow structure connected to the local sewer system. The stream even regularly burst its banks, leaving neighboring properties soaked and polluted. […]

276

Hobas and Flowtite “double feature” in the Netherlands

The water authority of Friesland, Wetterskip Fryslan, ordered 3 Amiblu GRP sinker pipelines to upgrade an existing irrigation system. Frequent high groundwater levels posed a problem to the local agriculture and the authority wanted to find a way to better manage its irrigation networks. Amiblu provided the client with a custom-tailored solution: Three GRP pipelines […]

279

805 m³ storage chamber with Amiscreen installed in Bavaria

The old local rainwater storage basin in the Bavarian municipality of Weißenohe had been built over 40 years ago. With a capacity of 540 m³, it was no longer able to handle the growing storage demands. Due to the chamber’s location directly underneath the railway station, an extension was not possible. Therefore, the wastewater association […]

281

First Hobas CSO chamber south of the Alps successfully installed

In October 2017, the municipality of Castel San Pietro in the Swiss Canton of Ticino has been provided with a sustainable, environmentally friendly solution for its sewer system: More than 40 interested people watched a Hobas CSO chamber being installed in the astonishing time of merely one day. The structure reliably separates suspended solids from […]

282

Laxa II Hydropower Plant

Laxá II is a 10 MW hydropower station located in northeast Iceland, approximately 85 kilometres east of the town of Akureyri. The tributary Kráká coming from the highlands of Iceland runs through sandy areas where volcanic sand is blown into the river. The annual amount of sand passing the power station has been estimated to be 10 – 30 thousand tons. The […]

283

Large Diameter Sewer Relining with NC Line in Southern France

In the surroundings of Toulon on the Mediterranean coast of France, a 6400-m long sewer channel is being rehabilitated. The challenging relining installation include works in more than 100 m depth. While the installation of tailor-made non-circular GRP half pipes is completed, the last phase of the project has started and should end beginning of […]

285

100 m3 Water Tank for 510 Residents

In the rural municipality of Chevilly which is located in the Swiss Canton of Vaud, a HOBAS Potable Water Tank ensures reliable water supply for the 250 local inhabitants as well as the similarly sized neighboring municipality. The old cast iron pipeline network as well as an aged potable water reservoir in the small Swiss […]

286

Renovation of 60-year-old Sewer System in Szombathely, HU

When the 60-year-old sewer system of the Hungarian city of Szombathely had to be replaced due to corrosion, the project team immediately opted for HOBAS. 300 m GRP Pipes DN 550 to DN 900 and 11 GRP shafts were successfully installed despite challenging project conditions. Szombathely is the administrative centre of Vas county in the […]

287

280 m³ Potable Water Tank Installed in Thal, Austria

In the municipality of Thal in the Austrian region of Styria, a 280 m³ Hobas Potable Water Tank was installed to enable a reliable future water supply. Hobas Installation Experts were faced with challenging site conditions which they managed perfectly and completed the project within two days. The inhabitants of Thal are pleased about a […]

289

HOBAS Pipes Do a Power of Good

After 45 years of operation, the coal-fired power generating station of Bouchain, located in France’s northernmost region Nord-Pas-de-Calais, has been replaced by a combined cycle power plant (CCPP). This project is part of the modernization plan of all fossil-fired power plants of the French company EDF (Electricité De France). EDF is the world’s largest energy […]

291

Installation of perforated HOBAS Pipes DN 300 for new generating units

Within one month only, a 550 m long perimeter drainage system was installed with HOBAS Pipes around the foundations of two new generating units of Opole Power Station. The conditions on site required maximum material quality and an easy, precise installation – with HOBAS Products neither was a problem. , Opole Power Station is a 1532 […]

292

Digging Deeper With HOBAS

The village Rudna in southwestern Poland is rather small. The local copper ore mine, however, is the largest one of its kind in Europe and one of the largest in the world.  ,Operated by KGHM Polska Miedź (Kombinat Górniczo-Hutniczy Miedzi Polish Copper), it produces 12 million tons of ore per year and employs 4,580 people. […]

293

HOBAS Pipes Withstand Salt and Chlorine in Chemical Plant in Ukraine

In South Ukraine, at a port on the Black Sea coast, 388 m HOBAS Pipes ,DN 400 were installed in a chemical plant to safely discharge industrial ,wastewater. , The Odesa Port Plant is a chemical facility at the Black Sea in South Ukraine that produces fertilizers. The existing stainless steel pipeline could no longer withstand the high […]

296

First HOBAS CSO Chamber in Germany

The collection and discharge of storm- and wastewater represents a daily challenge for wastewater facilities and municipalities. In combined systems, domestic, commercial, and industrial sewage and stormwater are all transported to the wastewater treatment plant by one shared sewer. Due to an increase in heavy rain events, sewers are frequently surcharged and wastewater treatment plants reach […]

297

New HOBAS Sewer System On Track in Slovakia

In the course of the comprehensive modernization of a railway line, 4600 m HOBAS CC-GRP Sewer Pipes DN 200 to DN 1800 have been installed in Western Slovakia. Due to the increased load of passing trains, the project called for a particularly durable pipe material. The rail transportation system in Slovakia is continuously improving. In […]

298

Renovation of interceptor sewer with large-diameter NC Line profiles in Bruchsal, DE

Non-circular GRP profiles with a cross-section of 3000/2000 mm were installed to renovate a large-diameter interceptor sewer in the German city of Bruchsal.   The combined interceptor sewer located in Werner-von-Siemens Street in the German city of Bruchsal is a central and historical drainage channel. Earliest records date back to 1640 and in 1896, the […]

299

Rehabilitation with HOBAS Profiles 1260/2110 mm in Germany

The sewage of Würzburg’s approximately 125,000 inhabitants runs through a 540 km long sewer network, which has evolved over the years, to the wastewater treatment plant in Mainaustraße Street, where the water is then reprocessed. The Würzburg Sewage Board (EBW) performs regular checks on the city’s sewer network. In doing so, damages were detected at […]

300

Rehabilitation with HOBAS Pipes in Germany

The need to rehabilitate old sewers poses a big challenge to all cities and urban wastewater associations. Many sewer channels were built of bricks, stoneware, concrete or reinforced concrete. As the years pass, even the highest quality channels show signs of material fatigue and groundwater infiltrations – a development resulting in increasing maintenance costs. Leaking […]

301

Renovation of Stormwater Sewer with HOBAS Pipes beneath Zürich Airport

Rehabilitation works at airports count among the technically most challenging renovation projects – especially if they concern pipelines. In late 2013, one of the stormwater sewers DN 2200 at the international Zürich Airport has been relined with HOBAS GRP Pipes over a length of 170 meters.   Serving 196 destinations, the Zürich Airport is Switzerland’s […]

308

HOBAS Jacking Pipes Premiere in Dubai, UAE

The “Nad Al Sheba 4 Sewage &, Drainage” project was initiated to provide Nad Al Sheba 4 across the Emirates Road to Dubai Academic City and parts of the Dubai Silicon Oasis area with an upstream GRP drainage trunk, large enough to accommodate the current and anticipated flow until 2030. In order to avoid traffic […]

309

Curved Jacking with Hobas Pipes De 2160 in Paris

The Société d‘Etudes, de Maîtrise d‘Ouvrage et d‘Aménagement Parisienne SEMAPA (project company for Parisian constructors and road-builders), is coordinating development projects in Paris‘ 13th arrondissement. In a recent stormwater treatment project on the south bank of the river Seine, 205 m Hobas GRP Pipes De 2160 have been jacked beneath the Ivry-sur-Seine dock.   SEMAPA’s […]

312

HOBAS Storage System Heidelsteinstraße

The collection and discharge of storm- and wastewater represents a daily challenge for wastewater facilities and municipalities. In combined systems, domestic, commercial, and industrial sewage and stormwater are all transported to the wastewater treatment plant by one shared sewer. Due to an increase in heavy rain events, sewers are frequently surcharged and wastewater treatment plants […]

316

Reliable Wastewater Discharge with HOBAS Jacking Pipes

HOBAS GRP Jacking Pipes were the first choice for interceptor sewer D, which runs along the river Svitava in the Czech city Brno. The pipes’ excellent hydraulic characteristics and the economic and ecologic advantages of trenchless installation, especially as regards the whole product life cycle, convinced the customer. The HOBAS Centrifugal Casting Process makes sure […]

317

Green Power with HOBAS Hydropower Pipelines – Clean energy from the power station NockEnergie Glanzer, AT

1270 water bodies, 8000 kilometers of rivers and numerous mineral springs make Carinthia not only the most water abundant region of Austria – it also ranks among the leading provinces for electricity from sustainable sources. Approximately 540 hydropower plants cover around 90 percent of the country’s province’s total electricity demand. Power Plant NockEnergie Glanzer An […]

320

HOBAS Storage System as Part of a Highway Drainage System in Poland

In recent years, Poland has seen a great number of road construction projects. Special attention was paid to the missing A4 highway sections connecting the Polish-German with the Polish-Ukrainian border. Once completed, the highway will be about 670 km long. HOBAS Retention Tanks ensure efficient drainage on important sections. To provide safe roadways, stormwater has […]

322

More Green Energy in Sri Lanka with HOBAS

The vibrant small hydro power industry in Sri Lanka saw a further green accomplishment in the south of the country approximately 2 km from Dehilanda in Wellawaya at the river Kuda Oya. With a capacity of 1.2 MW and approximately 5.7 GWh output per year, which will be fed into the national grid of Sri […]

323

Green Power with HOBAS Hydropower Pipelines – Clean energy from the power station Ebriachbach

1270 water bodies, 8000 kilometers of rivers and numerous mineral springs make Carinthia not only the most water abundant region of Austria – it also ranks among the leading provinces for electricity from sustainable sources. Approximately 540 hydropower plants cover around 90 percent of the country’s province’s total electricity demand. Power Plant Creek Ebriachbach The […]

324

HOBAS Pipe Sliplined Under Highway and Railroad in the US

Like most municipalities, the Texan City of Conroe has maintenance tasks within its water and wastewater system that need to be addressed. One such project, the Interstate 45 Sanitary Sewer project rehabilitated an existing DN 1400 trunk line. The solution consisted of sliplining with 163 meters of 1200 mm diameter HOBAS Centrifugally Cast Glassfiber Reinforced […]

325

Fast Installation, Longevity and Extendable Capacity – HOBAS Potable Water Tank in Hungary

A 100 m³ reservoir as been installed in Rum, Hungary, at a water treatment facility filtering iron and manganese from raw water between the water wells and water tower. The required reservoir consists of two 50 m³ water chambers DN 2400 and a utility chamber hosting amongst other instruments 4 heavy duty pumps. An expert […]

330

HOBAS Multiple Pump Shaft for the Renaturation of the Lausitz Region, Germany

The region Lausitz between Brandenburg and Saxony has been an important coal mining district with far-ranging commercial relevance for more than 100 years. Extensive surface mining, however, left its traces and resulted in a lunar-like landscape with extensive pits which would not be possible to completely backfill. The intended renaturation therefore comprises the creation of […]

331

Budaörs Invests in Local Storm- and Wastewater Discharge

On highly frequented roads, at highway crossings, but also in urban areas where under- and overground infrastructure is becoming denser and denser, there is a strong tendency toward trenchless installation of pipes. Also in Hungary HOBAS Jacking Pipes proved to be the best solution in the following project. Inspections of the storm- and wastewater collector […]

332

HOBAS Pipes for Austria’s first Mining Cave Power Station in Bad Bleiberg

Water has always been of major significance to the traditional Austrian spa and mining village Bad Bleiberg. The nearby 2166-meter-high mountain Dobratsch has acted a big part in providing spring water for centuries. On the mountain’s north side, 1015 meters above sea level, lays the Nötschbach Spring, which peaks at 500 liters per second. Amongst […]

333

Stormwater Pipes for Europa Retail Park Zvolen in Slovakia

Stormwater drainage system has been installed as part of the underground infrastructure for the Europa Retail Park Zvolen erected by the development company VAV from Banska Bystrica, Slovakia. Built on an area of 27 hectares this industrial zone shall host numerous superstores such as Tesco, Kika, Hornbach etc. by 2013. The stormwater drainage network was […]

335

Jacking Pipes to Enlarge Sewer Main

Several floods proved that the capacity of the DN 1250 concrete sewer main of Doetinchen was not sufficient during heavy rainfalls. The municipality of Doetinchem therefore decided to insert a second main for a 304 m section next to the existing sewer. Since the existing pipe had to remain in service parallel to the new […]

336

Storm Drain Line in Michigan Successfully Relined with HOBAS Pipes

Situated just 32 km northeast of Detroit, Clinton Township has the biggest population of the 1,242 townships in Michigan. Like most communities, it can provide us with many case studies in evolving infrastructure needs and it is not alone in its challenge to upgrade old infrastructure. Sanitary sewers and their overflows have been getting a […]

337

HOBAS Pipes as Auxiliary Static Support and Drainage System for the new Intra-Urban Train Tunnel, CH

How would you connect two train stations under a densely populated city where you are neither allowed to disturb inhabitants nor to disrupt traffic, and you cannot move the historic buildings “standing in the way“? In Zurich, the capital of Switzerland for example, HOBAS Jacking Pipes were chosen as auxiliary static construction that reliably helps […]

339

7,5 km Drainage Pipeline in Slovakia

For bridge drainage it was decided to utilize HOBAS CC-GRP BridgeLine Systems. High corrosion resistance, excellent hydraulic properties, a quick assembly under also challenging conditions, absolute leak tightness, angular deflection in the couplings, a long lifetime and resistance against UV light were the main points that convinced the client. Along with these advantages, several successful […]

340

Irrigation Pressure Pipeline in Thrac

However, summer rainfalls are not sufficient for this agricultural abundance and a concrete irrigation system had therefore been built somewhat 30 years ago, bringing water from the river Striama and the Pyasachnik to supply the town Chirpan. At the end of 2008 and with the decision of Bulgaria’s Ministry of Environment and Water, a project […]

341

Shaft-in-Shaft Rehabilitation & Shaft Renovation

The advantage of HOBAS ShaftLine Products is the minimal loss in cross-section, for they are not only relatively light walled, they moreover can be produced at variable lengths and with a wide range of diameters. Consequently, the cross section is reduced by only a few millimeters. The one-piece seamless CC-GRP Shafts are suitable for very […]

344

Double Pipe Sewer System for the Marche Region in Italy

In order to protect the environment from being contaminated in cases of pipeline failure, environmental specifications require double security measures. The design engineers therefore opted for coaxial pipes: any leakage eventually coming out of the inner pipeline, would be retained by the outer pipe. After a thorough comparison of today’s large variety of available pipe […]

345

Renovation of a Sewer Main with 15 Tangential Shafts in Strasbourg

The project, coordinated by the Water and Sanitation Division of the Urban Community of Strasbourg, involved the renovation of an egg shaped main dimensioned 1,400 x 1,900 mm that functions as combined sewer for domestic and industrial effluents. 980 m DN 1500 CC-GRP pipe were lowered into a trench with a depth varying between 3 […]

346

Purified Cooling Water Pipeline from River Rhine for Novartis Group

Hobas Curved Pressure Pipe Jacking beneath the river Rhine in Basel, Switzerland Novartis is one of the leading suppliers of innovative pharmaceutical products. The group operates in more than 140 countries worldwide and is strongly rooted in Switzerland. Currently, the company is turning the industrial complex of the St. Johann Areal in Basel with its […]

348

Safe Water Supply in Hungary Thanks to HOBAS Protective Pipes

Protective pipes from CC-GRP are often employed to protect potable water pipes and sewers running beneath busy roads, but most often crossing a tramway or railway. Here they hold a dual function: On the one hand they protect the carrier pipe from static and dynamic loads and on the other they facilitate rehabilitating or replacing […]

349

Record Sliplining Pipeline in Illinois, US

One of the most recent projects was Lake Street sewer rehab, including 2,100 m of DN 3000 semi-elliptic cast-in-place concrete sewer. The concrete sewer pipe had cracked at a number of places and had lime deposits at cracks and ‘cold’ joints, and the concrete had corroded due to the action of hydrogen sulfide and flowing […]

350

As long as the Yangtze wastewater pipeline

The project was conducted in three parts. 2.3 km HOBAS CC-GRP pipes DN 1200 to 2000 were installed for the first part, the second section consisted of 2.9 km DN 800 to 2000 and the third and longest part was established utilizing 7.4 km HOBAS pipes DN 800 to 2000. The complete line was built […]

351

Efficient Relining with HOBAS NC Line

The gravity and scope of damage had to be evaluated in order to determine which measures were to be taken and what should be prioritized. Sewer renovations ask for tailor-made solutions where local circumstances play an important role. Since repairs did not solve the problem, relining or the replacement of the sewer had to be […]

352

Hydropower Station in Norway Received a Durable HOBAS Penstock

Bearing the wood’s disadvantages on mind, Hålogaland Kraft sought after a long lasting, durable and maintenance free replacement. These characteristics should apply for both, underground as well as above ground installed pipes on supports. A perfect match was found in HOBAS CC-GRP Pipes which serve all requirements and soon were the favored option of the […]

353

Airport Drainage System for International Airport Sarajevo

These characteristics and the fact that several Airport drainage projects in the past such as Berlin Schönefeld, Schiphol Airport in Amsterdam, Airport Munich, to name just a few, have been implemented successfully with HOBAS Products convinced the client. Since the airfield was modernized and enlarged, the existing DN 800 concrete drainage system, which had been […]

354

Wasteater Pipline to WWTP for a Blue Danube

The project is financed by the EU from the design to construction and a first feasibility study was made by a consortium lead by the Swedish engineering company SWECO in 2002. Latest technologies will increase the effiency of biological treatment by three times and enable 92 % of waste water to be treated biologically. With […]

355

HOBAS Pipes for the ski destination in Utah

The installation was mostly direct bury with several tunneling installations of HOBAS Pipes through steel casings. On both occasions the pipe installed well and had no problems with visible deflection and joint leakage,” said Bart LaMont, project manager, Allied Construction and Development. To transport the sewage to the new facility, additional piping networks are necessary. […]

359

Airport Drainage System for New International Airport BBI (Berlin-Brandenburg International)

This high-performing airport sets just as high demands on its future pipe systems: High loads incomparable with those of road traffic and aggressive substances such as kerosene and anti-freeze, which are employed especially during the cold season, had to be considered choosing the right pipe material. After extensively comparing the options, the client decided for […]

360

Modernization of Sewer Pipeline System in Ljubljana

Due to the worldwide crisis, modernization and extension projects were taken step for step. The erection of a business center situated nearby the railway station was initiated first. The basement of the planned skyscraper lies 20 m beneath the ground providing room for three floors of parking lots. Since an old concrete sewer pipeline established […]

362

Pipeline to a Wastewater Collector using Trenchless Pipe Jacking in Offenbach

Two possibilities came into question regarding the realization of the collector: open trench or trenchless installation by jacking. Several reasons spoke in favor of jacking as for instance a forest would have had to have been cleared and private properties as well as farmland would have been affected when opting for an open trench. Apart […]

363

USIP Sewer Rehabilitation Project with HOBAS Pipes

A sewer that was reportedly built in 1896 has been serving the area. Planners decided that it needed permanent preservation to support future construction. They also decided that slipline rehabilitation was necessary to ensure the sewer would not interfere with the future USIP facility. HOBAS CC-GRP SewerLine® Systems was the only product that met all […]

364

Austrian ECO – power plant pipeline

Another noteworthy hydro project that was recently realized with HOBAS CC-GRP Pressure Pipe Systems is the small-scale power plant at the Loibl Stream in Carinthia, on the border to Slovenia. The plant is run by a group of 8 different entrepreneurs including the planner and turbine manufacturer. It consists of a timber intake structure, a […]

365

Waste Water Treatment at the French Atlantic Coast with HOBAS Restrained Pressure Pipes

The restrained pipe system supplied by HOBAS France provided the optimal solution that met all requirements not least due to its intrinsic advantages such as light weight, simple jointing and sturdiness. “HOBAS CC-GRP Pipe Systems are perfect for this project as they are fit for all types of terrain and perfectly follow the winding route”,, […]

366

Wastewater Pipeline extension in city of Minsk

Thus, an additional pipeline discharging up to 100,000 m³ wastewater was designed and realized in 2005 for the industrial area of Minsk. A second line with the same capacity followed one year later. In order to find the suitable pipe material, the project engineers thoroughly compared the different characteristics of possible alternatives and finally decided […]

368

Potable Tanks in the Northern Limestone Alps

The sufficient potable water supply for the approximately 1000 villagers was ensured with the establishment of an overhead tank holding 120 m³ of water. Difficult access to the site, ISO certification as well as numerous strict quality and hygiene requirements set by the Austrian legislation had to be considered when the water association of Pürgg […]

371

Rehabilitation by HOBAS Sliplining in China

The requirements regarding pipe design are: HOBAS Pipes with an outer diameter of 800 mm, SN 5000, PN 8. The roughness coefficient of the inner surface is 0.009 – 0.01. Given the data above, calculations showed that the flow capacity of the HOBAS® CC-GRP Pipe DN 800 was similar to that of the DN 900 […]

372

Fighting Corrosion to Preserve Historic Racetrack

HOBAS CC-GRP was the only material specified for the storm drainage improvement piping because of its resistance to corrosion, hydraulic capacity and the abrasion resistance. Detailed material specification also included specifics on the interior surface of the CC-GRP Pipe requiring a 50 percent elongation on the resin used. This was required to achieve the necessary […]

375

Reliable wastewater disposal in Liberec

Strict EU regulations apply to water supply and wastewater disposal. Like many other countries in Central Europe, the Czech Republic also has a lot to catch up with in this area. From 2006 – 2008, the entire water infrastructure in the basin of the river Lužická Nisa was therefore replaced and brought in line with […]

376

Wastewater Pipeline to the New Treatment Plant “Czajka” in Warsaw

To relieve the down-town sewer collector and to transport wastewater to the new treatment plant “Czajka”, astounding 3.3 km large diameter (up to OD 2160 mm) HOBAS CC-GRP Jacking Pipes are installed by remote controlled jacking (microtunneling) and were literally driven around several bends. Numerous microtunneling projects have been successfully implemented with HOBAS CC-GRP Jacking […]

377

Steel pipe replacement to ensure potable water supply for the brown coal plant

Since the line runs through an old industrial area with ecologically damaged terrain, it was the client’s high concern to choose the right pipe material which would withstand highly aggressive soil and which would not allow any diffusion whatsoever. Absolute leak tightness from in and outside the pipeline are essential for clean and hygienic potable […]

378

ECO Plant – Hydropower Pipeline in Schwarzach

Not only excellent hydraulic properties for higher output and easy handling in impracticable terrain yet also economic aspects convinced the client to opt for HOBAS CC-GRP Pipe Systems. HOBAS® made use of a computer supported planning systems to offer a detailed item list as well as an elaborate CAD-key plan. The pipe course was simulated […]

379

Bridge Drainage Pipeline in Zagreb

The complete pipeline consists of three major sections. MCP Culinecka is the first running from the treatment plant to the so-called Homeland Bridge. This part was accomplished by open cut installation with well compacted gravel sized 0 – 16 mm. The utilized HOBAS Manholes are T-Pieces DN 1000/800 covered with stainless steel blank flanges. Flexibility […]

380

Reconstruction and Extension of the Sewer Network in Beroun

Initiated in 2005, the project involved the installation of no less than 16 km sewer pipe. Two years later, in 2007, the project was finalized and the towns Králův Dvůr and Zahořany were connected to the local network, the town quarters Cibulka, Zavadilka and Jarov had a newly established sewer network, further extensions anticipated further […]

381

HOBAS Potable Water Systems in Afghanistan

In 2004, a megaproject in Afghanistan funded by the World Bank used HOBAS Potable WaterLine Systems. No less than 60,000 m of GRP pipes in DN 150 through DN 500 of pressure class PN 10 and over 1,000 fittings have since been supplying the population with water in eleven Afghan provinces. Only a light material […]

382

Sliplining HOBAS Pipes Under Airport Runway, US

McAllen-Miller International Airport (MFE) is the primary business airport of deep South Texas and Northeast Mexico. To accommodate the region’s future needs, a number of future projects were developed. A recently completed project included improvements to a raw water supply channel that traverses areas of Hidalgo County and parts of the airport. When the main […]

383

Rehabilitation and Completion of Olomouc Sanitary Network

One of the magistrate’s wishes was that the construction time should be kept as short as possible so that the tramway traffic would not be interfered and the strain on the inhabitants is minimized. All these requirements of the magistrate and the technical solution of the project offices affected the decision-making process concerning the pipe […]

384

Rehabilitation with HOBAS NC Line

During the contacts with the maintenance department of SMAT the possibilities of relining with HOBAS CC-GRP Pipe Systems was emphasised, for both circular and non-circular shapes. In the municipality of Turin and Venaria the rehabilitation of an egg-shaped pipeline of approx. 536 m was necessary. 136 m of that pipeline were close to collapse. With […]

385

Pipeline with Relining, Jacking and Special Profiles in one project

All construction works were allocated to a SOGEA/SADE consortium. The site is divided into 3 sections of which the 3rd and biggest section is approx. 2 km long costing around 16 million Euros. Assisted by his consulting engineers and the water operator Veolia Eau, the client based his decision on the solutions proposed by the […]

387

Sewage and Drainage System at Schiphol Airport in Amsterdam, NL

On June 21, 2012, Schipol Airport in Amsterdam has been chosen Europe’s Best Airport by ACI EUROPE (Airport Council International) for the third time. The Airport has been relying on the excellent characteristics of HOBAS Products since 2003 for HOBAS meets the high demands on product quality and short delivery times and therefore belongs to […]

388

Renewal and Expansion of Sewer System in Venlo

The municipality of Venlo counts more than 100,000 inhabitants and is as region in which economy and nature meet and strengthen each other the beating heart of North Limburg. Apart from being the trade gateway to Germany, Venlo features highway A73 and A67, the river Maas and a ECT (Europe Container Terminal) cargo hub which […]

390

Wastewater Treatment Plant MODŘICE

Brno had its wastewater treatment plant built in 1960. Reconstruction and extension plans were made in 1990 for the plant’s capacity was low and its technology insufficient. The rehabilitation project was first prepared by an Austrian company (SFC Schueffl &, Forsthuber Consulting GmbH) specialized in the field of environmental engineering, specifically in water and wastewater […]

391

Renovation of a sewer at Amsterdam Airport Schiphol

In June 2002 the runway was closed for all air traffic for total maintenance of the runway (new asphalt, lightning, landing equipment etc.). Only 17 days were allowed to close the runway, so the team worked 24 hours per day, workdays and weekends. In this short time, totally 73 meters of HOBAS CC-GRP Relining Pipe […]

392

Relining an Interceptor Sewer

Before starting with the rehabilitation, the sections were taken out of operation and the wastewater was rerouted. The launch shaft for installing the new pipe system was approximately eight times two meters and reached down to the bottom of the old pipe. Standard HOBAS Pipes with a length of six meters could be easily inserted. […]

393

Croatian Highway Bridge Drainage Systems

Due to their light weight, HOBAS CC-GRP Drainage Pipe Systems enabled a quick and easy manual installation. Furthermore, HOBAS CC-GRP Pipe Systems have a high abrasion and corrosion resistance, and are highly resistant against UV radiation. «This characteristic is particularly important because the pipes are constantly exposed to sun light. The excellent chemical resistance of […]

394

Reconstruction of Sewer in Hawaii using Trenchless Pipe Jacking

Several sewer projects with HOBAS Pipes were conducted in the last years. One of them was the Wanaao Road/Keolu Drive Reconstruction Sewer with installation of a gravity sewer line, which includes CC-GRP Jacking Pipes installed by Frank Coluccio Construction. Bijan Khamanian, HOBAS Division Manager, explained, “HOBAS Pipes are very well accepted in both Honolulu and […]

395

Trenchless Jacking Pipeline with Two Curved Sections

The project “Zielona Góra” included 1149 meters of HOBAS CC-GRP Sewer Pipe Systems of DE 1099 and 1229 and SN 128000 with a rectilinear and two curved sections with a radius of 350 m and 175 m. In case of rectilinear microtunneling the compressive force is distributed evenly on the entire pipe. The challenge oft […]

396

HOBAS Drainage System for Gurk area

Product benefits speak for themselves: The high corrosion resistance of the HOBAS CC-GRP Pipe Systems guarantees long maintenance intervals, reducing the high costs to a minimum for maintenance work in areas difficult to access. Great care has to be taken when building in environmentally sensitive zones, which is why absolute leak tightness was top priority […]

397

Water for wine growing – HOBAS Pipes laid in alluvial sediment

Following in-depth comparisons with other types, HOBAS CC-GRP Pipe was finally chosen for building this secondary pipe system comprising diameters of between DN 300 and 900. Decisive were the wide application range, high corrosion resistance and flexibility of the pipes in the native soil, which consists primarily of alluvial sediment. The Italian planners also praised […]

398

Increase the capacity of wastewater pipeline leading to the wastewater treatment plant of Banská Bystrica

A ,concrete interceptor was originally installed. However, having reassessed its hydraulic qualities, the client reconsidered and opted for HOBAS CC-GRP (glass fibre reinforced plastics) Pipe Systems. After the delivery of a HOBAS® SewerLine® DN 2000 Pipe, the works were stopped for the project was included in the European Pre-Accession Program ISPA. The project was technically filed […]

399

Renovation of Sewerage System Interceptors and Connection to Treatment Plant in Torun

The project involved renewing the sewerage system interceptors and connecting them to the treatment plant by a route which however crossed the botanical gardens, one of the most environmentally sensitive areas in the city. To avoid damage to the park, the municipality decided to use the microtunneling installation method with HOBAS® centrifugally cast jacking pipes […]

400

River Litz Hydroelectric Power Station Pipeline

After only 16 months’ construction, the first of three generators started producing electricity in the new powerhouse on the River Litz in Silbertal (Vorarlberg). Shortly afterwards, in May 1998, the whole hydroelectric plant went into operation. Construction costs totaling just over 11 million euros and annual power generation of around 22 million kWh make Litz […]

401

Airport Drainage System at Munich Airport Terminal 2

In extension for the landing field HOBAS CC-GRP Pipe Systems were installed. These pipes are exclusively used as drainage lines for the landing field East and installation depth was 1.5 – 2.5 m. Beginning end of 1997, about 15 km HOBAS CC-GRP Pipe Systems of DN 150 to DN 500 were installed. Quality demand of […]

405

Bridge Drainage with Hobas Pipes on Croatian Highway in Osijek

Since Croatia’s declaration of independence in 1991, approximately 900 km of highways were built in the country, connecting Central Europe with the east and south of the Balkan States. The highways include a great number of tunnels, bridges, and viaducts. One particularly long bridge across the Drava has recently been successfully equipped with a HOBAS […]

406

HOBAS Pressure Pipes Ensure Filisur Power Plant Operation for more than 50 years

The first GRP pipes by the dye works “Basler Stückfärberei AG”, from which the company HOBAS evolved, were produced in Basel, Switzerland, in the 1950s. The founding fathers already suspected that their product was something very special. One of the first clients that utilized HOBAS Pipes as penstock for a hydropower plant was the Swiss […]

408

How to make a coal fired power plant in Morocco more eco-friendly?

As part of its national energy plan, the government of Morocco is building the first eco-optimized coal-fired power plant. The plant will be located near the Moroccan city of Safi and will help the country meet its growing electricity demands. The installation of Flowtite pipes for the flue gas desulphurization system (FGD) has recently been […]

409

210 m³ Amiscreen storage sewer in Zwickau

An impressive Amiblu storage sewer with integrated Amiscreen system was successfully installed in the German city of Zwickau. Waterworks Zwickau opted for Flowtite GRP pipes by Amiblu to realize the sewer; concrete pipes were no option due to their bigger wall thickness and respectively smaller capacity at same diameter. Further decisive factors were the GRP […]