Search Search
    Amiblu
    • News
    • Menu Menu
    You are here: Home1 / Reference2 / Civil works, supply, and installation of pipelines for intake works and...

    Civil works, supply, and installation of pipelines for intake works and upstream lines A5/A6 – M10–M18 and G13–G18 sectors

    PROJECT DETAILS
    Country:Morocco
    City:Tadla
    Year:2015
    Application:Irrigation
    Installation:Open Trench
    Technology:Flowtite
    Total Length:10677 m
    Nominal Diameter DN:1400 | 2200 mm
    Nominal Pressure PN:10 bar
    Nominal Stiffness SN:5000 N/m2
    Contractor:STAM
    /wp-content/uploads/logo-amiblu-white.png 0 0 Sabrina Waldner /wp-content/uploads/logo-amiblu-white.png Sabrina Waldner2025-07-16 08:26:022025-07-16 08:26:02Civil works, supply, and installation of pipelines for intake works and upstream lines A5/A6 – M10–M18 and G13–G18 sectors

    More information about this application

    Loading
    back

    Link to: SEA WATER SUPPLY – LAAYOUNE WASHING PLANT – Lot No. 1: Seawater pipeline Link to: SEA WATER SUPPLY – LAAYOUNE WASHING PLANT – Lot No. 1: Seawater pipeline SEA WATER SUPPLY – LAAYOUNE WASHING PLANT – Lot No. 1: Seawater pipelin...Link to: Irrigation, access roads and sanitation networks – ASJEN perimeter – Ouezzane – Phase 2 Link to: Irrigation, access roads and sanitation networks – ASJEN perimeter – Ouezzane – Phase 2 Irrigation, access roads and sanitation networks – ASJEN perimeter – Ouezzane...
    Scroll to top