Search Search
    Amiblu
    • News
    • Menu Menu
    You are here: Home1 / Reference2 / Construction of 2nd downstream section of the supply pipeline for BOUHOUDA...

    Construction of 2nd downstream section of the supply pipeline for BOUHOUDA perimeter

    PROJECT DETAILS
    Country:Morocco
    City:Taounate
    Year:2011
    Application:Irrigation
    Installation:Open Trench
    Technology:Flowtite
    Total Length:6011 m
    Nominal Diameter DN:1600 mm
    Nominal Pressure PN:10 bar
    Nominal Stiffness SN:5000 N/m2
    Contractor:STAM
    /wp-content/uploads/logo-amiblu-white.png 0 0 Sabrina Waldner /wp-content/uploads/logo-amiblu-white.png Sabrina Waldner2025-07-16 08:25:382025-07-16 08:25:38Construction of 2nd downstream section of the supply pipeline for BOUHOUDA perimeter

    More information about this application

    Loading
    back

    Link to: Supply, transport, and installation of pipelines and related structures – A4 Supply & M8/M9 Distribution Networks – Annour sector Link to: Supply, transport, and installation of pipelines and related structures – A4 Supply & M8/M9 Distribution Networks – Annour sector Supply, transport, and installation of pipelines and related structures –...Link to: Drinking water supply to AIT OURIR center from ROCADE treatment plant – Marrakech – Lot: Pipelines Link to: Drinking water supply to AIT OURIR center from ROCADE treatment plant – Marrakech – Lot: Pipelines Drinking water supply to AIT OURIR center from ROCADE treatment plant – Marrakech...
    Scroll to top