Search Search
    Amiblu
    • News
    • Menu Menu
    You are here: Home1 / Reference2 / Construction of irrigation supply and distribution pipelines, including...

    Construction of irrigation supply and distribution pipelines, including related structures – Arraja sector – Beni Moussa Ouest perimeter

    PROJECT DETAILS
    Country:Morocco
    City:Tadla
    Year:2011
    Application:Irrigation
    Installation:Open Trench
    Technology:Flowtite
    Total Length:37958 m
    Nominal Diameter DN:400 | 800 | 1200 mm
    Nominal Pressure PN:10 bar
    Nominal Stiffness SN:5000 N/m2
    Contractor:STAM
    /wp-content/uploads/logo-amiblu-white.png 0 0 Sabrina Waldner /wp-content/uploads/logo-amiblu-white.png Sabrina Waldner2025-07-16 08:25:472025-07-16 08:25:47Construction of irrigation supply and distribution pipelines, including related structures – Arraja sector – Beni Moussa Ouest perimeter

    More information about this application

    Loading
    back

    Link to: Drainage system – BOUREGREG bridge Link to: Drainage system – BOUREGREG bridge Drainage system – BOUREGREG bridgeLink to: Supply works for the Mhajrat/Ajras perimeter linked to Oued Martil dam Link to: Supply works for the Mhajrat/Ajras perimeter linked to Oued Martil dam Supply works for the Mhajrat/Ajras perimeter linked to Oued Martil dam
    Scroll to top