    Construction of main irrigation line (right bank) supplying the BOUHOUDA perimeter

    PROJECT DETAILS
    Country:Morocco
    City:Taounate
    Year:2014
    Application:Irrigation
    Installation:Open Trench
    Technology:Flowtite
    Total Length:12664 m
    Nominal Diameter DN:400 | 600 | 700 mm
    Nominal Pressure PN:10 | 12 | 16 bar
    Nominal Stiffness SN:5000 N/m2
    Contractor:STAM
    /wp-content/uploads/logo-amiblu-white.png 0 0 Sabrina Waldner /wp-content/uploads/logo-amiblu-white.png Sabrina Waldner2025-07-16 08:25:542025-07-16 08:25:54Construction of main irrigation line (right bank) supplying the BOUHOUDA perimeter

    More information about this application

    Loading
    back

    Link to: Supply and installation of pipelines – Maraa Kantra (Lot 2: 4.65 km) – Dar Khrofa perimeter Link to: Supply and installation of pipelines – Maraa Kantra (Lot 2: 4.65 km) – Dar Khrofa perimeter Supply and installation of pipelines – Maraa Kantra (Lot 2: 4.65 km) – Dar...Link to: Replacement of irrigation pipelines for sub-sectors A, B1/B2 and E1/E2 – R’mel sector – Loukkos perimeter – Lot 1: sub-sector A Link to: Replacement of irrigation pipelines for sub-sectors A, B1/B2 and E1/E2 – R’mel sector – Loukkos perimeter – Lot 1: sub-sector A Replacement of irrigation pipelines for sub-sectors A, B1/B2 and E1/E2 – R’mel...