Search Search
    Amiblu
    • News
    • Menu Menu
    You are here: Home1 / Reference2 / Construction of pumping station and treated wastewater transfer pipeline...

    Construction of pumping station and treated wastewater transfer pipeline to YOUSSOUFIA laundry facility

    PROJECT DETAILS
    Country:Morocco
    City:Youssoufia
    Year:2013
    Application:Raw Water
    Installation:
    Technology:Flowtite
    Total Length:4790 m
    Nominal Diameter DN:500 mm
    Nominal Pressure PN:10 bar
    Nominal Stiffness SN:5000 N/m2
    Contractor:STAM
    /wp-content/uploads/logo-amiblu-white.png 0 0 Sabrina Waldner /wp-content/uploads/logo-amiblu-white.png Sabrina Waldner2025-07-16 08:25:472025-07-16 08:25:47Construction of pumping station and treated wastewater transfer pipeline to YOUSSOUFIA laundry facility

    More information about this application

    Loading
    back

    Link to: Drinking water supply to the Greater Agadir area from the Moulay Abdellah dam – Single Lot: Raw water pipeline from dam to existing loading reservoirs Link to: Drinking water supply to the Greater Agadir area from the Moulay Abdellah dam – Single Lot: Raw water pipeline from dam to existing loading reservoirs Drinking water supply to the Greater Agadir area from the Moulay Abdellah dam...Link to: Air circuit / Wastewater treatment station – PRV pipelines (aboveground and underground) – BENGUERIR Link to: Air circuit / Wastewater treatment station – PRV pipelines (aboveground and underground) – BENGUERIR Air circuit / Wastewater treatment station – PRV pipelines (aboveground and...
    Scroll to top