    Hydro-agricultural development – Ouljas – Sector IV / Taounate – Moyen Sebou & Inaouen Aval Project – Lot 2: Group 6 (Ouljas D29 to D32)

    PROJECT DETAILS
    Country:Morocco
    City:Fes
    Year:2022
    Application:Irrigation
    Installation:Open Trench
    Technology:Flowtite
    Total Length:1500 m
    Nominal Diameter DN:400 mm
    Nominal Pressure PN:16 bar
    Nominal Stiffness SN:5000 N/m2
    Contractor:SOCHTRAP
    /wp-content/uploads/logo-amiblu-white.png 0 0 Sabrina Waldner /wp-content/uploads/logo-amiblu-white.png Sabrina Waldner2025-07-16 08:26:222025-07-16 08:26:22Hydro-agricultural development – Ouljas – Sector IV / Taounate – Moyen Sebou & Inaouen Aval Project – Lot 2: Group 6 (Ouljas D29 to D32)

    More information about this application

    Loading
    back

    Link to: CONNECTION WORKS – RKIZA Dam to AEP network – from SFFEISSIF Dam to Figuig Palm Grove Link to: CONNECTION WORKS – RKIZA Dam to AEP network – from SFFEISSIF Dam to Figuig Palm Grove CONNECTION WORKS – RKIZA Dam to AEP network – from SFFEISSIF Dam to Figuig...Link to: Supply and installation of pipelines and irrigation hydrants – Secondary network – Yaagoubia, Taouzinte, Hakkia sub-sectors (Tessaout Aval – Upstream T2) Link to: Supply and installation of pipelines and irrigation hydrants – Secondary network – Yaagoubia, Taouzinte, Hakkia sub-sectors (Tessaout Aval – Upstream T2) Supply and installation of pipelines and irrigation hydrants – Secondary network...
    Scroll to top