Search Search
    Amiblu
    • News
    • Menu Menu
    You are here: Home1 / Reference2 / Strengthening of the drinking water supply to the coastal area between...

    Strengthening of the drinking water supply to the coastal area between Rabat and Casablanca from the Sidi Mohamed Ben Abdellah dam, Lot No. 5: Treated water pipeline between Tamesna and Oued Cherrat

    PROJECT DETAILS
    Country:Morocco
    City:Rabat
    Year:2012
    Application:Potable Water
    Installation:Open Trench
    Technology:Flowtite
    Total Length:13454 m
    Nominal Diameter DN:2000 mm
    Nominal Pressure PN:12 bar
    Nominal Stiffness SN:5000 N/m2
    Contractor:STAM
    /wp-content/uploads/logo-amiblu-white.png 0 0 Sabrina Waldner /wp-content/uploads/logo-amiblu-white.png Sabrina Waldner2025-07-16 08:25:472025-07-16 08:25:47Strengthening of the drinking water supply to the coastal area between Rabat and Casablanca from the Sidi Mohamed Ben Abdellah dam, Lot No. 5: Treated water pipeline between Tamesna and Oued Cherrat

    More information about this application

    Loading
    back

    Link to: Strengthening of the drinking water supply to the Rabat – Casablanca coastal area – Lot No. 4: Treated water pipeline Link to: Strengthening of the drinking water supply to the Rabat – Casablanca coastal area – Lot No. 4: Treated water pipeline Strengthening of the drinking water supply to the Rabat – Casablanca coastal...Link to: Lot No. 6: Treated water pipeline between Oued Cherrat and Oued Bouznika Link to: Lot No. 6: Treated water pipeline between Oued Cherrat and Oued Bouznika Lot No. 6: Treated water pipeline between Oued Cherrat and Oued Bouznika
    Scroll to top