Search Search
    Amiblu
    • News
    • Menu Menu
    You are here: Home1 / Reference2 / Strengthening of the drinking water supply to the Rabat – Casablanca c...

    Strengthening of the drinking water supply to the Rabat – Casablanca coastal area – Lot No. 3: Raw water pipeline

    PROJECT DETAILS
    Country:Morocco
    City:Rabat
    Year:2012
    Application:Potable Water
    Installation:Open Trench
    Technology:Flowtite
    Total Length:3870 m
    Nominal Diameter DN:2000 mm
    Nominal Pressure PN:12 bar
    Nominal Stiffness SN:5000 N/m2
    Contractor:STAM
    /wp-content/uploads/logo-amiblu-white.png 0 0 Sabrina Waldner /wp-content/uploads/logo-amiblu-white.png Sabrina Waldner2025-07-16 08:25:472025-07-16 08:25:47Strengthening of the drinking water supply to the Rabat – Casablanca coastal area – Lot No. 3: Raw water pipeline

    More information about this application

    Loading
    back

    Link to: Chichaoua – Hydro-agricultural development of Assif Al Mal perimeter – Lot 2: Pipeline from PM 339 to PM 6048 and regulation structure (OB2) Link to: Chichaoua – Hydro-agricultural development of Assif Al Mal perimeter – Lot 2: Pipeline from PM 339 to PM 6048 and regulation structure (OB2) Chichaoua – Hydro-agricultural development of Assif Al Mal perimeter – Lot...Link to: Strengthening of the drinking water supply to the Rabat – Casablanca coastal area – Lot No. 4: Treated water pipeline Link to: Strengthening of the drinking water supply to the Rabat – Casablanca coastal area – Lot No. 4: Treated water pipeline Strengthening of the drinking water supply to the Rabat – Casablanca coastal...
    Scroll to top