    1270 water bodies, 8000 kilometers of rivers and numerous mineral springs make Carinthia not only the most water abundant region of Austria – it also ranks among the leading provinces for electricity from sustainable sources. Approximately 540 hydropower plants cover around 90 percent of the country’s province’s total electricity demand.

    Power Plant NockEnergie Glanzer
    An impressive hydropower project implemented with HOBAS GRP Pipes is the power plant NockEnergie Glanzer in the village of Radenthein. Gerald Glanzer and his son David built a small hydropower plant right on their doorstep at the Kaningbach Creek. It consists of a Tyrolean weir, used to channel the Kaningbach Creek, as well as a sand trap and a screening system. The connected 1400 m long HOBAS Hydropower Pipeline (DN 900, SN 10000, PN 6-14) leads to the powerhouse with several curves that were realized by means of angular deflection in the couplings. At a head of 106 m, the average flow rate is 1.4 m³ per second. Each year, 4 Million kWh of energy will be produced and fed into the KELAG power grid – one of Austria’s leading energy suppliers.

    https://www.amiblu.com/wp-content/uploads/HOBAS_Austria_Hydropower_Pipeline_Radenthein_NockEnergie_Glanzer_GmbH_01.jpg 190 360 Bernd Burger /wp-content/uploads/logo-amiblu-white.png Bernd Burger2018-01-16 00:00:002018-01-16 00:00:00Green Power with HOBAS Hydropower Pipelines – Clean energy from the power station NockEnergie Glanzer, AT

    More information about this application

    Loading
    back

    PROJECT DETAILS
    Project ID: [7334]
    Country:Austria
    City:Radenthein
    Year:2012
    Application:Hydropower
    Installation:Open Trench
    Technology:Hobas
    Total Length:1400 m
    Nominal Diameter DN:900 mm
    Nominal Pressure PN:6 | 14 bar
    Nominal Stiffness SN:10000 N/m2
    Downloads:

    Green Power with HOBAS Hydropower Pipelines Clean energy from the power stations Ebriachbach and NockEnergie Glanzer AT
    OEkostrom mit HOBAS Wasserkraftwerksleitungen Saubere Energie aus den Kraftwerken Ebriachbach und NockEnergie Glanzer AT
    Link to: HOBAS Penstock in Chile Link to: HOBAS Penstock in Chile HOBAS Penstock in ChileHOBAS Penstock in ChileLink to: HOBAS XL Diameter Hydropower Line in the Apennins of Reggio Emilia, IT Link to: HOBAS XL Diameter Hydropower Line in the Apennins of Reggio Emilia, IT HOBAS XL Diameter Hydropower Line in the ApenninsHOBAS XL Diameter Hydropower Line in the Apennins of Reggio Emilia, IT
    Scroll to top