Search Search
    Amiblu
    • News
    • Menu Menu
    You are here: Home1 / Reference2 / HOBAS Penstock in Chile
    HOBAS Penstock in Chile

    HOBAS Penstock in Chile

    The first HOBAS Pipeline was installed over 50 years ago in Switzerland. It was a penstock realized in inconveniently steep and hardly accessible terrain which is today still in excellent condition and service. Now, half a century later, HOBAS, hydro and Switzerland meet again at pretty much the other end of the world: In southern Chile, close to the Argentinian border, a local Swiss client chose HOBAS Pipes for his hydropower project. Following numerous successful hydropower projects all around the globe, this is the first HOBAS Hydro Pipeline installed in Latin America. The hydro power plant San Miguel is located in the region Alto Bio Bio southeast of Concepción in the Andes. There are already quite a few storage and run-of-river power plants in this area abundant with water. The client’s reasons for choosing HOBAS reminded of those 50 years ago: Since the terrain was steep and difficult to access, the pipes had to be light and easy to install. Thanks to the HOBAS Couplings which accommodate angular deflections there was also no need for fittings. With short section pipes the client saved on 16 bends and the time-consuming as well as costly construction of thrust blocks. Long drawn curves enabled an optimal adaptation of the pipeline to the territory without sharp changes in direction which would have affected the hydraulics. HOBAS offered support already during the planning stage to optimize the routing and transportation. In the first two weeks a HOBAS Installation Expert accompanied the construction works on site. This way, around 1.4 km HOBAS Pipes DN 600, 700 and 800 in the pressure classes PN 6-20 and lengths of one, two and 5.8 m were easily and successfully installed. The supplied product range also included reducers, masonry couplings and a T-piece. The client and contractor imported the first walking excavator to Chile in order to master the steepest sections of the route. Since the light-weight HOBAS Pipes did not require any further heavy equipment the construction area could be reduced considerably and the impact on nature was kept to a minimum. The Swiss contractors were enthused about the pipes’ easy installation and their light weight as well as the possibility to safely establish curves via angular deflection in the couplings: “Many thanks to the entire HOBAS Team for their professional support, especially during the planning stage and installation. We can warmly recommend HOBAS to every power plant constructor.”

    https://www.amiblu.com/wp-content/uploads/HOBAS_America_Latina_Hydropower_Plant_San_Miguel_Chile_1_01.jpg 225 400 Bernd Burger /wp-content/uploads/logo-amiblu-white.png Bernd Burger2018-01-16 00:00:002018-01-16 00:00:00HOBAS Penstock in Chile

    More information about this application

    Loading
    back

    PROJECT DETAILS
    Project ID: [7332]
    Country:Chile
    City:Alto Bio Bio
    Year:2012
    Application:Hydropower
    Installation:Open Trench
    Technology:Hobas
    Total Length:1414 m
    Nominal Diameter DN:600 | 700 | 800 mm
    Nominal Pressure PN:6 | 10 | 16 | 20 bar
    Nominal Stiffness SN:5000 | 10000 N/m2
    Downloads:

    HOBAS Penstock in Chile How history repeats itself
    HOBAS Wasserkraftwerksleitungen in Chile Wie sich die Geschichte wiederholt
    Link to: Reliable Wastewater Discharge with HOBAS Jacking Pipes Link to: Reliable Wastewater Discharge with HOBAS Jacking Pipes Reliable Wastewater Discharge with HOBAS Jacking PipesReliable Wastewater Discharge with HOBAS Jacking PipesLink to: Green Power with HOBAS Hydropower Pipelines – Clean energy from the power station NockEnergie Glanzer, AT Link to: Green Power with HOBAS Hydropower Pipelines – Clean energy from the power station NockEnergie Glanzer, AT Green Power with HOBAS Hydropower PipelinesGreen Power with HOBAS Hydropower Pipelines – Clean energy from the power...
    Scroll to top