    LOT 1: Construction of disk shutter, storage basin, and first section of distribution pipeline (PK 00 to PK 9.75)

    PROJECT DETAILS
    Country:Morocco
    City:Tafilalet
    Year:2021
    Application:Irrigation
    Installation:Open Trench
    Technology:Flowtite
    Total Length:32343 m
    Nominal Diameter DN:400 | 1000 mm
    Nominal Pressure PN:10 | 16 bar
    Nominal Stiffness SN:5000 N/m2
    Contractor:STAM
    /wp-content/uploads/logo-amiblu-white.png 0 0 Sabrina Waldner /wp-content/uploads/logo-amiblu-white.png Sabrina Waldner2025-07-16 08:26:152025-07-16 08:26:15LOT 1: Construction of disk shutter, storage basin, and first section of distribution pipeline (PK 00 to PK 9.75)

    More information about this application

    Loading
    back

    Link to: Renewal and reinforcement of existing wastewater collector in Oulfa Link to: Renewal and reinforcement of existing wastewater collector in Oulfa Renewal and reinforcement of existing wastewater collector in OulfaLink to: LOT 2: Construction of second section of distribution pipeline (PK 9.75 to PK 34.9) Link to: LOT 2: Construction of second section of distribution pipeline (PK 9.75 to PK 34.9) LOT 2: Construction of second section of distribution pipeline (PK 9.75 to PK...
    Scroll to top