Search Search
    Amiblu
    • News
    • Menu Menu
    You are here: Home1 / Reference2 / Renewal and reinforcement of existing wastewater collector in Oulfa

    Renewal and reinforcement of existing wastewater collector in Oulfa

    PROJECT DETAILS
    Country:Morocco
    City:Casablanca
    Year:2021
    Application:Sewer
    Installation:
    Technology:Flowtite
    Total Length:770 m
    Nominal Diameter DN:400 | 600 | 800 mm
    Nominal Pressure PN:1 bar
    Nominal Stiffness SN:10000 N/m2
    Contractor:HYDROCHALLENGE
    /wp-content/uploads/logo-amiblu-white.png 0 0 Sabrina Waldner /wp-content/uploads/logo-amiblu-white.png Sabrina Waldner2025-07-16 08:26:152025-07-16 08:26:15Renewal and reinforcement of existing wastewater collector in Oulfa

    More information about this application

    Loading
    back

    Link to: Reinforcement and renewal of DN400 wastewater collector – Hassan 2 Boulevard – Mohammedia Link to: Reinforcement and renewal of DN400 wastewater collector – Hassan 2 Boulevard – Mohammedia Reinforcement and renewal of DN400 wastewater collector – Hassan 2 Boulevard...Link to: LOT 1: Construction of disk shutter, storage basin, and first section of distribution pipeline (PK 00 to PK 9.75) Link to: LOT 1: Construction of disk shutter, storage basin, and first section of distribution pipeline (PK 00 to PK 9.75) LOT 1: Construction of disk shutter, storage basin, and first section of distribution...
    Scroll to top