Breivikbotn kraftverk
PROJECT DETAILS
| Country: | Norway |
| City: | Bygstad |
| Year: | 2023 |
| Application: | Hydropower |
| Installation: | Above Ground |
| Technology: | Flowtite |
| Total Length: | 1130 m |
| Nominal Diameter DN: | 900 | 1000 mm |
| Nominal Pressure PN: | 6 | 10 bar |
| Nominal Stiffness SN: | 5000 N/m2 |
| Consultant: | Norconsult AS |
| Contractor: | HAK Entreprenør AS |
| Client: | Hammerfest Energi AS |
