Portugal
Porto & Gondomar
2018
Sewer
3129 m
Between the cities of Gondomar and Porto in northern Portugal, a 3129 m long Amiblu Flowtite pressure pipeline was installed to relieve an ecologically sensitive river from excessive sewage discharges.
Rio Tinto river is a small tributary of the river Douro and has a rich biodiversity. Over the past years, flora and fauna have decreased due to discharges from two wastewater treatment plants (WWTP) that were led directly into Rio Tinto’s sensible waters. In 2018, the councils of Gondomar and Porto decided to stop the pollution and build a new pipeline to divert the treated and depurated water away from Rio Tinto into the larger river Duoro, which has a much bigger regeneration and assimilative capacity.
The clients Águas do Porto and Águas de Gondomar chose to implement this project with a reliable, sustainable GRP pipe solution. 3129 m Amiblu Flowtite pressure pipes DN 800, PN 12 were installed in open trench between the WWTPs Freixo and Meiral, alongside the Rio Tinto river. A high groundwater table and strict environmental requirements posed a challenge to the installation works but were easily managed thanks to the GRP material’s optimal properties.
The client is very satisfied with the completion of the project which created a new natural environment and returned the Rio Tinto river to the population, including a pedestrian and cycling lane that follows the riverbed.
Click on the video below to get a visual impression of this remarkable project!
© Amiblu Holding GmbH, 2025