Kraków – S7 Igołomska Widoma
PROJECT DETAILS
| Country: | Poland |
| City: | Kraków |
| Year: | 2022-2023 |
| Application: | Retention System, Drainage |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 1000 m |
| Nominal Diameter DN: | 600 | 800 | 1200 | 900 mm |
| Nominal Pressure PN: | 1 | 1 | 1 | 1 bar |
| Nominal Stiffness SN: | 10 | 50 | 10 | 16 N/m2 |
