Lya kraftverk
PROJECT DETAILS
| Project ID: [24933] | |
| Country: | Norway |
| City: | Torpo |
| Year: | 2007 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 1524 m |
| Nominal Diameter DN: | 1300 | 1400 mm |
| Nominal Pressure PN: | 6 | 20 bar |
| Nominal Stiffness SN: | 5000 | 5000 N/m2 |
| Consultant: | E-CO Vannkraft AS |
| Contractor: | T.Engene AS |
| Client: | E-CO Vannkraft AS |
