R.C. Cont. 92-C12
PROJECT DETAILS
| Project ID: [25338] | |
| Country: | Saudi Arabia |
| Year: | 2007 |
| Application: | Seawater |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 996 m |
| Nominal Diameter DN: | 600 | 1000 mm |
| Nominal Pressure PN: | 6 bar |
| Contractor: | Abdullah Ahmed Dossary |
| Client: | Royal Commission |


