Poland
Sopot
2023
Sewer
200 m
The aim of the project was the reconstruction of Mazowiecka Street in Sopot together with the implementation of a comprehensive rainwater retention system. The solution was designed to counteract flooding caused by increasingly frequent heavy rainfall by installing underground retention tanks and applying innovative GRP pipe technologies adapted to difficult terrain and climatic conditions.
Due to dynamic climate change and the growing occurrence of intense precipitation, the city of Sopot has been facing serious challenges related to surface water management. During heavy rainfall, water flowing down from the hills on the south-western side of the city turns into rushing streams, carrying large amounts of gravel and sand. This phenomenon also affected Mazowiecka Street, located at the border of Sopot and Gdynia, where repeated flooding occurred. At the same time, the roadway itself was already worn, making its reconstruction combined with stormwater retention the most justified solution.
The investment area was characterised by a significant slope, limited available space and direct proximity to forested terrain. For these reasons, it was decided to install eight underground retention tanks beneath the reconstructed road. Five of them were designed as tubular tanks made of GRP pipes. In order to utilise the available space beneath the road as efficiently as possible, the tanks were built using pipes of different diameters. The entire investment was completed with a rain garden supplied with retained rainwater, providing a sustainable and nature-based element of the stormwater management system. Additionally, flow regulators were installed inside the tanks to ensure controlled discharge and to maintain the required retention function.
Due to stringent technical and operational requirements, Amiblu was the only manufacturer able to supply suitable GRP pipes for this project. A completely new technology was applied, with the inner layer of the pipes manufactured as a mixture of polyester resin and silicon carbide. This innovative liner significantly increases abrasion resistance, ensuring long-term and safe operation in conditions of steep terrain and stormwater heavily loaded with sand and gravel washed down from the surrounding hills.
The retention tanks required the following storage capacities:
The system was built using Amiblu Flowtite filament-wound GRP pipes with nominal diameters ranging from DN 300 to DN 2000, along with system manholes. All components were supplied from the nearby Amiblu production facility in Gdańsk, which positively affected logistics and the overall implementation schedule.
The application of GRP pipes provided high abrasion resistance, optimal adaptation to the limited space available beneath the road and long-term durability of the entire retention system. As a result, the reconstructed Mazowiecka Street not only meets current hydraulic and operational requirements, but also represents a resilient infrastructure solution addressing the challenges posed by climate change and extreme weather events.
Celem realizacji projektu była przebudowa drogi przy ul. Mazowieckiej w Sopocie oraz wdrożenie kompleksowego systemu retencji wód opadowych, mającego na celu przeciwdziałanie podtopieniom spowodowanym deszczami nawalnymi, poprzez montaż zbiorników retencyjnych i zastosowanie innowacyjnych technologii rur GRP, dostosowanych do trudnych warunków terenowych i klimatycznych.
Ukształtowanie terenu miasta Sopot pod wpływem dynamicznych zmian klimatycznych i zjawiska deszczy nawalnych napotkało się z problemem podtopień. Wzgórza od strony południowo-zachodniej podczas gwałtownych opadów zamieniały się w rwące potoki. Taka sytuacja miała miejsce również przy ulicy Mazowieckiej na granicy miasta z Gdynią. Sama droga była już wyeksploatowana, dlatego jej przebudowa wraz z montażem zbiorników retencyjnych była jak najbardziej zasadna. Teren inwestycji charakteryzował się znacznym spadkiem oraz ograniczonym obszarem inwestycji. Graniczy on również bezpośrednio z lasem.
Zdecydowano więc na montaż 8 zbiorników retencyjnych pod drogą, w tym 5 zbiorników rurowych na bazie rur GRP. Ze względu na wspomniany już teren, zbiorniki zbudowane były z różnych średnic, tak aby maksymalnie wykorzystać przestrzeń pod drogą. Całość inwestycji zwieńczał ogród deszczowy, który zasilać miała właśnie woda deszczowa. W zbiornikach przez wykonawcę zamontowano również regulatory przepływu aby mieć pewność, że funkcja retencji będzie zachowana.
Poprzez rygorystyczne wymogi zawarte w specyfikacji technicznej danej inwestycji Amiblu jako jedyny producent rur GRP był w stanie dostarczyć niezbędny materiał. W tym celu zastosowano zupełnie nową technologię na rynku, a mianowicie warstwę wewnętrzną rurę wykonano jako mieszankę żywicy poliestrowej z węglikiem krzemu. Rura z taką warstwą (linerem) są bardziej odporne na ścieranie, co przy dużym spadku terenu, charakterze opadów (dużo żwirów i piasków wymywanych ze wzgórz) gwarantuje bezpieczną, długoletnią eksploatację. Wymagana objętość według projektów to odpowiednio:
W danej inwestycji zastosowano szeroki asortyment średnic rur nawojowych w technologii Flowtite z pobliskiej fabryki Amiblu w Gdańsku (średnice od DN300-DN2000 oraz studnie systemowe).