• Contact Us
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
  • Ukrainian Ukrainian Ukrainian ua
  • Australian Australian Australian au
  • Türkçe Türkçe Turkish tr
Search Search
Amiblu
  • Products
    • Product Selector
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • GRE pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Sewer and Drainage
    • CSO system with solid retention
    • Potable Water
    • Hydropower
    • Trenchless Applications
    • Irrigation
    • Industry
    • Special Pipes
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • Non-Circular Filament Winding (NC Line Technology)
    • Certificates
  • Why GRP
    • Sustainability at Amiblu
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations (EPDs)
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Pipelines2 / Drainage
Bridge, street and highway drainage Neuhäusel (Kalterbach-Talbrücke)

Bridge, street and highway drainage Belzig (Bundesstraße 102)

Bridge, street and highway drainage Talbrücke Ochsengrund (Bundesautobahn A 73)

Bridge, street and highway drainage Brücke über die Weiße Elster (Bundesautobahn A 38)

Bridge, street and highway drainage Spreebrücke (Bundesautobahn A 15)

DE07BRL_1
Germany’s largest cable-stayed bridge drainage

HR07SEL_Z_1
Bridge Drainage Pipeline in Zagreb

Adria Highvay, Prgomet - Dugopolje

Adria Highway, Vrpolje-Prgomet

Pazin, Gas station

Siedlce - Terespol route - jacking under railway

E20 Mrozy - jacking under railway

Ostrow Wielkopolski - jacking under railway

E20 Mrozy - jacking under railway

Inowroclaw - jacking under railway

Elblag - Palisade

Lancut - bridge

Kiezmark - building of bridge

Dobczyca - Bridge on Gwdza

Wroclaw - A4 highway

Wabroze Wielkie - A4

SSE Zarnowiec - KD

Rzeszow, Zaleska - storm sewer

Lask - Airport

Kutno - Jozefow - ring road

Kostrzyn at Odra river - Small ring road

Konstancin - stormwater sewer

Kielce - stormwater sewer

Jasienica - stormwater sewer

Gizycko, stromwater sewer

Page 37 of 87«‹3536373839›»

Who we are

Contact us
Career
About us
News

What we do

Sustainability
Products
References
GRP

Resources for you

Brochures
Product guide
Expert Papers
Videos

Join us

Data

Technical data

Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

Get Info

References

Reference database

Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

Start browsing

EPDs

Environmental Product Declarations

Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

Learn more

© Amiblu Holding GmbH, 2026

Copyright      Disclaimer      GTC      Privacy Policy

Scroll to top