• Contact Us
  • English
  • Български Български Bulgarian bg
  • English English English en
  • Français Français French fr
  • Deutsch Deutsch German de
  • Polski Polski Polish pl
  • Русский Русский Russian ru
  • Español Español Spanish es
  • Čeština Čeština Czech cs
  • Dansk Dansk Danish da
  • Magyar Magyar Hungarian hu
  • Italiano Italiano Italian it
  • Nederlands Nederlands Dutch nl
  • Norsk Norsk Norwegian no
  • Svenska Svenska Swedish sv
  • Română Română Romanian ro
  • Slovenčina Slovenčina Slovak sk
  • Português Português Portuguese pt-pt
  • Ukrainian Ukrainian Ukrainian ua
Search Search
Amiblu
  • Products
    • Product Selector
    • Online Product Catalog
    • Non-pressure pipes
    • Pressure pipes
    • Jacking pipes
    • Non-circular pipes (NC Line)
    • PROX pipes
    • Joints and Couplings
    • Fittings
  • Applications
    • Reference Database
    • Wastewater
    • CSO system with solid retention
    • Potable water
    • Hydropower
    • Trenchless Applications
    • Special Pipes
    • Irrigation
    • Industry
  • Technologies
    • Centrifugal Casting (Hobas Technology)
    • Filament Winding (Flowtite Technology)
    • NC Line Technology
    • Certificates
  • Why GRP
    • Green
    • Footprint
    • Environmental responsibility of GRP
    • Economic responsibility of GRP
    • Social responsibility of GRP
    • Environmental Product Declarations
  • Company
    • About Us
    • Contact Us
    • News
    • Jobs
    • Compliance
  • Downloads
  • Menu Menu
You are here: Home1 / Pipelines
Tessaout Aval / Haouz

Wastewater transfer – Bouskoura, Oulad Saleh & BOUF

Discharge pipeline – Berkane

Dakhla – Lot 3

Treated water transfer – Marrakech WWTP to OCP mining sites in Benguerir – Lot 2

WAVE II EAST / OSBL – Pipe supply

LAATTAOUIA

SAFI

Basin – Jorf Lasfar

Dakhla – Lot 2

Asilah – Lot 1

LAATTAOUIA

SAISS Distribution Network – Part 2

Irrigation – Tadla G5

Missour – Lot 3

Main pipeline and distribution network works – Tassift-Tizgane irrigation perimeter – Chefchaouen DPA zone

Supply and delivery of PRV pipes – DN1100 and DN1000

Supply pipeline and distribution network – G9 sector

Moulay Abdellah supply pipelines – from Jorf desalination plant to El Jadida – Lot 4

Rehabilitation of pipelines connecting 1000 m³ and 500 m³ reservoirs – Dakhla

Reinforcement of AEP to Dakhla – Lot 1: Pipeline (SP0-RMC1000m³)

Tamanar – Lot 2: Raw water pipeline

Zagora Province from Agdez Dam – Group 2 – Tazarine – Lot 2: Adduction 2

Leak repairs

Transfer of desalinated water – JORF LASFAR

Souk Larbaa – from Loukkos treatment plant – Lot: Completion of pipelines 1

Laattaouia, Kelaâ des Sraghna, and neighboring villages – from Rocade canal – Lot 2.3: Tamellalt Antenna pipeline

INTERCONNECTION WORKS – OUED EL MAKHAZINE Dam with DAR KHROFA Dam – Lot 2: Section 2 of supply pipeline

INTERCONNECTION WORKS – OUED EL MAKHAZINE Dam with DAR KHROFA Dam – Lot 1: Pumping station and section 1 of supply pipeline

WAVE II Desalination – Jorf Lasfar

Page 1 of 1030123›»

Who we are

Contact us
Career
About us
News

What we do

Footprint
Products
References
GRP

Resources for you

Brochures
Product guide
Technical documents
Videos

Join us

  • English

    Data

    Technical data

    Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

    Get Info

    References

    Reference database

    Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

    Start browsing

    EPDs

    Environmental Product Declarations

    Our EU-standardized EPDs provide transparent, verified and comparable information on the environmental impact of more than 1200 Amiblu products throughout their life cycle.

    Learn more

    © Amiblu Holding GmbH, 2025

    Copyright      Disclaimer      GTC      Privacy Policy

    Scroll to top