Chemical Industry

Link Country Year Total Length [m] Nominal Diameter DN [mm] Nominal Pressure PN [bar] Nominal Stiffness SN [N/m2] Technology PDF
KWI Austria 2021 300 6 10000 Flowtite
Palma – Impulsión UTE Estación Bombeo Spain 2021 800 900 | 1000 | 2000 6 5000 Flowtite
BCH Erőmű Hungary 2021 366 200 | 300 | 400 | 800 1 20000 Hobas
Jacking Chemelot Netherlands 2021 120 1500 80000 Hobas
Mondi Powerflut Oy Finland 2019 192 800 1 10000 Flowtite
Hinca auger boring Ontinyent Spain 2020 78 860 1 36000 Flowtite
9777-19 Mixers Fluytec Spain 2020 9 50 | 750 6 5000 | 10000 Flowtite
9893/20 Fluytec Spain 2020 4 600 | 900 6 5000 Flowtite
Conductos desagüe Máquina 32 Spain 2020 36 125 | 250 6 2500 Flowtite
Mixers ref. 9816-20 Spain 2020 3 65 | 900 6 5000 Flowtite
Proyecto Repsol Cartagena Spain 2020 26 800 6 10000 Flowtite
Kemira Krems Austria 2017 40 300 | 400 1 10000 Hobas
Epx_West Sea Spain 2018 309 125 | 200 | 250 10 10000 Flowtite
Mondi Ružomberok Slovakia 2017 786 1000 6 10000 Hobas
Tarnow AZOTY pipeline Poland 2016 120 200 10 10000 Hobas
Industrial pipeline Austria 2016 30 400 1 10000 Hobas
Structural rehabilitation of the Gascogne Paper sea outfall in Mimizan (40) DN 920×1610 France 2015 120 Non-Circular Hobas
NC Line (520/910 and 500/750 mm) Smurfit Kappa Nettingsdorfer, Paper Industry Austria 2015 350 Non-Circular Hobas
Installation of perforated HOBAS Pipes DN 300 for new generating units Poland 2014 550 300 1 20000 Hobas
Highly Durable HOBAS Pipes for Safe Paper Production in Austria Austria 2014 990 1100 1 10000 Hobas
HOBAS Pipes Withstand Salt and Chlorine in Chemical Plant in Ukraine Ukraine 2014 388 400 6 5000 | 10000 Hobas
HOBAS Pipeline on the Adisseo site in the city of Commentry (03) regarding a biomass cogeneration plant’s construction France 2014 138 500 | 250 1 | 1 10000 | 10000 Hobas
Shaft for leachate – rehabilitation of 2 shafts in Castries France 2014 24 1600 1 5000 Hobas
Hallein Schweighofer Fiber – Paper industry Austria 2013 990 1100 1 10000 Hobas
Ružomberok, MONDI SCP, sewerage Slovakia 2013 394 300 | 600 1 | 1 10000 | 10000 Hobas
Bratislava VW, wastewater Slovakia 2012 1140 500 | 600 | 1000 | 1200 1 10000 | 12500 Hobas
Lemesany, chemical pipeline Slovakia 2011 70 200 1 5000 Hobas
Sandoz (Biochemie) KUNDL, Erweiterungsbau Austria 2011 188 600 1 10000 Hobas
Escondida Copper Mine in Chile Equipped with HOBAS Pipes Chile 2011 800 600 6 Hobas
Bratislava Volkswagen – sewerline Slovakia 2010 36 200 1 10000 Hobas

Data

Technical data

Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

References

Reference database

Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

Footprint

Our footprint

We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.