Combined Rainwater-Sewer System

LinkCountryYearTotal Length [m]Nominal Diameter DN [mm]Nominal Pressure PN [bar]Nominal Stiffness SN [N/m2]TechnologyPDF
D3 Úsilné – Hodějovice, CSO 1400/2000 Czech Republic 2019 183 250 | 800 | 1400 1 10000 Hobas
Amiblu NC Line installed in open trench in Austria DN 900/1350×25 Austria 2019 65 Non-Circular 1 Amiblu
Sarajevo, Stup, Tibra pacific building Bosnia and Herzegovina 2019 720 250 | 300 | 400 1 10000 Hobas
Sarajevo, Bingo building Bosnia and Herzegovina 2019 102 800 1 10000 Hobas
Sarajevo, Fra Matije Divkovića Bosnia and Herzegovina 2019 1164 300 | 400 | 500 1 10000 Hobas
Čadca – Bukov Slovakia 2019 125 600 | 400 | 300 1 | 1 | 1 10000 | 10000 | 10000 Hobas
Stauraumkanal Oberscheinfeld Germany 2019 36 2800 | 3000 1 Flowtite
Amiscreen – Weissach Porsche Germany 2019 229 2500 | 3000 1 Flowtite
Renovation of sewer system with Amiblu NC Line in Krakow Poland 2018-2019 746 Non-Circular Amiblu
Reconstructie Kerklaan Leimuiden Netherlands 2018 430 800 1 5000 Hobas
Beroun – rekonstrukce mostu č.11533 – odvodnění Czech Republic 2018 36 150 1 10000 Hobas
D 8 – odvodnění mostu č. 039 Doksany Czech Republic 2018 226 150 | 200 1 | 1 10000 | 10000 Flowtite
Hrochův Týnec – odvodnění mostu Czech Republic 2018 18 150 1 10000 Flowtite
Jihlava – odvodnění mostu Czech Republic 2018 414 200 | 250 1 | 1 10000 | 10000 Hobas
Rokycany – odvodnění mostu Czech Republic 2018 42 200 1 10000 Hobas
Nitra Jaguár Land Rover I. Slovakia 2017 1727 1000 | 1200 | 1000 | 1200 1 | 1 | 6 | 6 10000 | 10000 | 10000 | 10000 Hobas
Nitra Jaguár Land Rover II. Slovakia 2017 1507 1000 | 1200 | 1000 | 1200 1 | 1 | 6 | 6 10000 | 10000 | 10000 | 10000 Hobas
South longitudinal 4 Bosnia and Herzegovina 2018 910 200 | 300 1 10000 Hobas
Sarajevo, ViK 2017 Bosnia and Herzegovina 2018 432 200 1 10000 Hobas
Bypass Brčko Bosnia and Herzegovina 2018 1600 150 | 300 | 400 | 600 1 2500 | 5000 | 10000 Hobas
Drivuša – Perin han Bosnia and Herzegovina 2018 483 200 | 250 | 350 1 2500 | 5000 Hobas
Lager Bosnia and Herzegovina 2018 444 300 1 10000 Hobas
Velešići Bosnia and Herzegovina 2018 340 300 1 10000 Hobas
Sarajevo, Amira Krupalije Bosnia and Herzegovina 2018 275 300 | 500 1 10000 Hobas
Kurta Schorka Bosnia and Herzegovina 2018 540 500 | 1200 1 10000 Hobas
International airport Sarajevo Bosnia and Herzegovina 2018 1442 150 | 200 | 300 1 10000 Hobas
Ilidža, Plandište Bosnia and Herzegovina 2018 890 150 | 300 1 10000 Hobas
Hotonj IV Bosnia and Herzegovina 2018 1054 300 1 5000 Hobas
Blažuj Bosnia and Herzegovina 2018 570 300 | 400 1 10000 Hobas
Halid-bega Hrasnice, Bunica, Vrelo, Stari drum Bosnia and Herzegovina 2018 702 400 1 10000 Hobas

Data

Technical data

Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

References

Reference database

Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

Footprint

Our footprint

We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.