Who we are
What we do
Resources for you
Link | Country | Year | Total Length [m] | Nominal Diameter DN [mm] | Nominal Pressure PN [bar] | Nominal Stiffness SN [N/m2] | Technology | |
---|---|---|---|---|---|---|---|---|
Assen Yordanov Str. (incl. fittings) | Bulgaria | 2021 | 192 | 400 | 500 | 1 | 10000 | Hobas | |
Kapitan Petko | Bulgaria | 2021 | 230 | 600 | 700 | 1 | 10000 | Hobas | |
Sredna Kula & Dolapite (incl. manholes and fittings) | Bulgaria | 2021 | 1104 | 800 | 900 | 1000 | 1200 | 1 | 10000 | Hobas | |
Mischwasserkanal Markranstädt – Erneuerung | Germany | 2021 | 260 | 600 | 900 | 1 | 10000 | Amiblu | |
Mischwasserkanal Markranstädt – Erneuerung | Germany | 2021 | 40 | 400 | 1 | 10000 | Hobas | |
S19 Niedrzwica Kraśnik odc. C | Poland | 2020-2021 | 1248 | 900 | 1000 | 1100 | 1400 | 1 | 1 | 1 | 1 | 10000 | 10000 | 10000 | 10000 | Flowtite | |
Zabrze – ul. Handlowa odwodnienie drogi | Poland | 2020 | 278 | 500 | 600 | 1 | 1 | 10000 | 10000 | Flowtite | |
Staukanal Mischwasser Leizig | Germany | 2020 | 600 | 300 | 3000 | 1 | 10000 | Hobas | |
Staukanal Wilhelmshaven | Germany | 2020 | 160 | 1200 | 1800 | 1 | 10000 | Flowtite | |
Stauraumkanal Feldstiege | Germany | 2020 | 250 | 800 | 1200 | 1500 | 1 | 10000 | Hobas | |
Stauraumkanal Cottbus (Verlegung in Flüssigboden) | Germany | 2020 | 234 | 1200 | 1500 | 1 | 5000 | Flowtite | |
Stauraumkanal Leipzig (Verlegung in Flüssigboden) | Germany | 2020 | 600 | 300 | 2000 | 3000 | 3500 | 1 | 10000 | Hobas | |
Stauraumkanal Leipzig Hans-Weigel-Str. | Germany | 2020 | 520 | 300 | 1000 | 2000 | 1 | 10000 | Hobas | |
Staukanal Büchen | Germany | 2020 | 150 | 1200 | 1 | 10000 | Hobas | |
NC GFK-Einzelrohrlining für Sanierung Betonstauraumkanal | Germany | 2020 | 92 | 2000 | 2100 | 1 | 10000 | Amiblu | |
GFK Stauraumkanal für Regenwasser Erlengrund | Germany | 2020 | 360 | 800 | 1000 | 1 | 10000 | Hobas | |
GFK Stauraumkanal Gewerbepark Pferdsfeld, KFZ Testcenterstrecke | Germany | 2020 | 254 | 2400 | 1 | 2500 | Flowtite | |
D3 Úsilné – Hodějovice, CSO 1400/2000 | Czech Republic | 2019 | 183 | 250 | 800 | 1400 | 1 | 10000 | Hobas | |
Amiblu NC Line installed in open trench in Austria DN 900/1350×25 | Austria | 2019 | 65 | Non-Circular | 1 | Amiblu | ||
Sarajevo, Stup, Tibra pacific building | Bosnia and Herzegovina | 2019 | 720 | 250 | 300 | 400 | 1 | 10000 | Hobas | |
Sarajevo, Bingo building | Bosnia and Herzegovina | 2019 | 102 | 800 | 1 | 10000 | Hobas | |
Sarajevo, Fra Matije Divkovića | Bosnia and Herzegovina | 2019 | 1164 | 300 | 400 | 500 | 1 | 10000 | Hobas | |
Čadca – Bukov | Slovakia | 2019 | 125 | 600 | 400 | 300 | 1 | 1 | 1 | 10000 | 10000 | 10000 | Hobas | |
Stauraumkanal Oberscheinfeld | Germany | 2019 | 36 | 2800 | 3000 | 1 | Flowtite | ||
Amiscreen – Weissach Porsche | Germany | 2019 | 229 | 2500 | 3000 | 1 | Flowtite | ||
Renovation of sewer system with Amiblu NC Line in Krakow | Poland | 2018-2019 | 746 | Non-Circular | Amiblu | |||
Reconstructie Kerklaan Leimuiden | Netherlands | 2018 | 430 | 800 | 1 | 5000 | Hobas | |
Beroun – rekonstrukce mostu č.11533 – odvodnění | Czech Republic | 2018 | 36 | 150 | 1 | 10000 | Hobas | |
D 8 – odvodnění mostu č. 039 Doksany | Czech Republic | 2018 | 226 | 150 | 200 | 1 | 1 | 10000 | 10000 | Flowtite | |
Hrochův Týnec – odvodnění mostu | Czech Republic | 2018 | 18 | 150 | 1 | 10000 | Flowtite |
© Amiblu Holding GmbH, 2022
Data
Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.
References
Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.
Footprint
We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.