Main pipeline and distribution network works – Tassift-Tizgane irrigation perimeter – Chefchaouen DPA zone
Hydro-agricultural development – Ouljas – Sector IV / Taounate – Moyen Sebou & Inaouen Aval Project – Lot 2: Group 6 (Ouljas D29 to D32)
Supply and installation of pipelines and irrigation hydrants – Secondary network – Yaagoubia, Taouzinte, Hakkia sub-sectors (Tessaout Aval – Upstream T2)
Construction of third distribution network section up to hydrant heads – Irrigation development & climate change adaptation project
Distribution network works (Part 2) – Agricultural development – Saiss Plain – From Mdez Dam – Lot 1
Distribution network works (Part 2) – Agricultural development – Saiss Plain – From Mdez Dam – Lot 4
Diversion and protection of drinking water and sanitation networks affected by widening of Tit Mellil–Berrechid highway (RR315)
Distribution network works (Part 2) – Agricultural development – Saiss Plain – From Mdez Dam – Lot 2
Supply and installation of pipelines and irrigation hydrants – Secondary network – Tabouassite sub-sector (Upstream T2 – Tessaout Aval)
LOT 1: Construction of disk shutter, storage basin, and first section of distribution pipeline (PK 00 to PK 9.75)