Link | Country | Year | Total Length [m] | Nominal Diameter DN [mm] | Nominal Pressure PN [bar] | Nominal Stiffness SN [N/m2] | Technology | |
---|---|---|---|---|---|---|---|---|
Reposición Binefar HUESCA | Spain | 2021 | 162 | 500 | 600 | 800 | 16 | 10000 | Flowtite | |
Huesca – CR La Sabina Balsa Regulación | Spain | 2021 | 172 | 800 | 6 | 5000 | Flowtite | |
Reposición Pomar del Cinca | Spain | 2021 | 30 | 900 | 1000 | 16 | 10000 | Flowtite | |
Canal Bajo Zona Riaño (León) | Spain | 2021 | 868 | 1300 | 16 | 10000 | Flowtite | |
Tuberia diferentes DN CR Andevalo | Spain | 2021 | 72 | 1100 | 1300 | 10 | 10000 | Flowtite | |
Reposición CR La Loma de Quinto | Spain | 2021 | 6253 | 600 | 800 | 1000 | 16 | 10000 | Flowtite | |
Mantenimiento Sistema Segarra Garrigues | Spain | 2021 | 22 | 1300 | 16 | 10000 | Flowtite | |
Reposición Flumen S.VII | Spain | 2021 | 1590 | 400 | 500 | 600 | 800 | 10 | 16 | 10000 | Flowtite | |
Tubo reposición CR Sodeto | Spain | 2021 | 72 | 700 | 900 | 1200 | 16 | 10000 | Flowtite | |
DN700 CR Andevalo Guadiana fase 2021 | Spain | 2021 | 3762 | 700 | 700 | 10 | 5000 | Flowtite | |
Regadíos Blanca nº0756503 | Spain | 2021 | 6048 | 400 | 600 | 700 | 800 | 6 | 10 | 16 | 10000 | Flowtite | |
Tubagem ABORO PRFV | Portugal | 2021 | 54 | 700 | 800 | 900 | 16 | 10000 | Flowtite | |
Regadio de Fuentes de Ebro | Spain | 2021 | 11340 | 400 | 500 | 600 | 700 | 10 | 16 | 5000 | Flowtite | |
Canal del Cinca Sector XX-Bis 3ª Parte | Spain | 2021 | 18239 | 600 | 700 | 800 | 1000 | 10 | 16 | 10000 | Flowtite | |
es-palencia – Varios Pisuerga | Spain | 2021 | 48 | 450 | 900 | 16 | 10000 | Flowtite | |
Tubería reposición CR Macias Picavea | Spain | 2021 | 24 | 1600 | 10 | 10000 | Flowtite | |
Sustitución tuberia Bardenas | Spain | 2021 | 48 | 500 | 700 | 16 | 10000 | Flowtite | |
Sariñena – TRAGSA Averias Sector VII | Spain | 2021 | 84 | 400 | 900 | 1400 | 16 | 10000 | Flowtite | |
Acequia de Ontiñena | Spain | 2021 | 72 | 450 | 700 | 800 | 16 | 10000 | Flowtite | |
Flumen Fase II, CR el Molinar | Spain | 2021 | 1650 | 600 | 700 | 800 | 900 | 10 | 16 | 10000 | Flowtite | |
Payuelos VIII, 2021 | Spain | 2021 | 6648 | 500 | 600 | 700 | 900 | 10 | 5000 | Flowtite | |
2ª Fase Canal Aragón y Cataluña | Spain | 2021 | 2676 | 900 | 1400 | 10 | 10000 | Flowtite | |
Sectores XVIII-XIX Monegros II | Spain | 2021 | 7536 | 400 | 500 | 600 | 800 | 10 | 5000 | Flowtite | |
Reposición Blanca 2022 | Spain | 2021 | 2574 | 400 | 500 | 10 | 10000 | Flowtite | |
Tubería reposición 2021 CR Villafranca | Spain | 2021 | 96 | 500 | 600 | 700 | 1000 | 16 | 10000 | Flowtite | |
Restitución canal Benínar-Aguadulce, | Spain | 2021 | 459 | 2000 | 16 | 10000 | Flowtite | |
Reparación Canal Calanda Alcañiz | Spain | 2021 | 126 | 500 | 600 | 700 | 16 | 10000 | Flowtite | |
Reparación Nonaspe | Spain | 2021 | 60 | 600 | 700 | 16 | 10000 | Flowtite | |
Tác öntözés | Hungary | 2021 | 42 | 400 | 450 | 1 | 100000 | Hobas | |
Háromfa öntözés | Hungary | 2021 | 60 | 600 | 1 | 10000 | 80000 | Hobas |
© Amiblu Holding GmbH, 2022
Data
Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.
References
Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.
Footprint
We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.