Irrigation

LinkCountryYearTotal Length [m]Nominal Diameter DN [mm]Nominal Pressure PN [bar]Nominal Stiffness SN [N/m2]TechnologyPDF
Balsa elevada y parque solar fotovoltaico Marcén, Lalueza (Huesca) Spain 2019 830 900 10 10000 Flowtite
Canal de la Maya (Fase II) _TSA000066669 Spain 2019 5461 400 | 500 | 600 | 700 10 5000 Flowtite
CR Canal del Pisuerga sector A Spain 2019 2273 400 | 500 | 700 10 5000 Flowtite
CR Canal del Pisuerga sector B Spain 2019 2576 400 | 500 10 5000 Flowtite
Mod.Regadios C.R.Blanca Spain 2019 96 800 10 10000 Flowtite
Modernización Canal de Zorita (Salamanca), TSA000066940 Spain 2019 7836 400 | 500 | 600 10 5000 Flowtite
Regadío CCRR en Ciudad Real Spain 2019 3483 700 | 800 | 900 | 1000 10 10000 Flowtite
Regadío en Illana y Leganiel Spain 2019 690 600 | 900 6 | 16 5000 Flowtite
Reparaciones de Campaña y Curbe (Huesca)_contrato 333.330 Spain 2019 2892 1000 | 1200 10 10000 Flowtite
Riego CR La Llanada, Romeral y Miralbueno. TTMM Aldeanueva de Ebro Spain 2019 2316 700 10 10000 Flowtite
Santalecina Mod. Regadío C.R. San Pedro, Zona Baja Santalecina (Interc. 2019-2020)_TSA0067119) Spain 2019 6680 600 | 700 | 800 | 1000 10 10000 Flowtite
Sector XVI Payuelos_contrato 333.327 Spain 2019 3948 1300 10 10000 Flowtite
Sector XVIII Payuelos_contrato 333.328 Spain 2019 5364 800 | 900 | 1000 10 5000 Flowtite
SOT Proyecto en Binefar Spain 2019 241 800 6 5000 Flowtite
Cerbara di Città di Castello/PG Italy 2017 66 400 | 500 | 700 | 800 10 10000 Hobas
Altivole (TV) Pedemontana Veneta Italy 2017 168 700 16 10000 Flowtite
Bassano del Grappa (VI)-pedemontana Italy 2018 110 700 16 10000 Hobas
Sostituzione rete irrigua – Cicognolo Italy 2019 201 700 | 1000 6 | 10 10000 Flowtite
Relining Capitanata tubazione CLS Foggia Italy 2019 60 1100 16 10000 Hobas
Irrigazione Bolzano pro305 Italy 2019 210 350 | 1200 10 | 16 5000 | 10000 Flowtite
Severna Bačka, irrigation Serbia 2019 1330 500 | 1200 6 5000 | 10000 Hobas
Canal Bajo Alberche Spain 2018 4200 1600 6 | 10 5000 Flowtite
Cr La Llanada_Aldeanueva Spain 2018 4230 600 | 700 10 | 16 10000 Flowtite
Tuberia Cr Andevalo Spain 2018 72 800 10 5000 Flowtite
Canal De La Maya Spain 2018 2116 400 | 500 | 800 10 5000 Flowtite
Canal Del Pisuerga Spain 2018 1139 600 10 5000 Flowtite
Riego Del Rio Adaja Spain 2018 549 900 10 10000 Flowtite
Santalecina (Huesca) Spain 2018 1352 500 10 10000 Flowtite
Trans.Reg.Illana-Leganiel Spain 2018 14222 400 | 500 | 800 | 1000 6 | 10 | 16 5000 | 10000 Flowtite
Codroipo E Sedegliano Italy 2018 360 350 16 10000 Flowtite

Data

Technical data

Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

References

Reference database

Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

Footprint

Our footprint

We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.