LinkCountryYearTotal Length [m]Nominal Diameter DN [mm]Nominal Pressure PN [bar]Nominal Stiffness SN [N/m2]TechnologyPDF
Lyondell wastewater treatment Netherlands 2018 324 350 | 250 1 | 1 10000 | 10000 Hobas
235795 Waternet uitmondstukken Vogelenzang Netherlands 2018 0 1800 1 10000 Amiblu
Kemira Krems Austria 2017 40 300 | 400 1 10000 Hobas
Vaja, almaúsztató Hungary 2017 29 600 1 10000 Hobas
Astravec Nuclear Power Station Belarus Belarus 2017 250 | 300 | 350 | 400 6 | 6 | 6 | 6 5000 | 5000 | 5000 | 5000 Flowtite
Jaworzno Elektrownia – Maszynownia Poland 2017 110 3600 10 10000 Flowtite
Turkmenistan, Garlyk Turkmenistan 2017 3 1000 6 10000 Hobas
Głowgów, Modernizacja chłodni 1 celkowej w HM Głogów Poland 2017 16 500 1 5000 Hobas
Puławy – ZAP Melaminy II & III Poland 2017 30 300 | 500 | 900 10 10000 Hobas
Puławy instalacja rurociągów podziemnych wody chłodzącej – Zakłady Azotowe Poland 2017 325 350 | 900 | 1250 6 16000 Hobas
Plywood factory Riga Latvia 2017 48 700 1 10000 Hobas
Aanekoski, Metsa Fibre BTT Area 9 SW pipes Finland 2016 1203 300 | 400 | 1000 | 1200 1 10000 Hobas
Zagreb, HTV Croatia 1997 384 200 6 5000 Hobas
HEP TE TO Croatia 2010 381 200 | 600 | 900 | 1000 10 | 10 | 1 | 1 5000 | 5000 | 5000 | 5000 Hobas
Horice Czech Republic 2013 19 500 1 2500 Hobas
HOBAS Pipeline on the Adisseo site in the city of Commentry (03) regarding a biomass cogeneration plant’s construction France 2014 138 500 | 250 1 | 1 10000 | 10000 Hobas
Eger city center rain water and sewer Hungary 2014 468 500 | 600 1 | 1 5000 | 5000 Hobas
Susak, poliester tank Croatia 2016 1600 1 5000 Hobas
Virovitica, measuring manholes Croatia 2016 2000 1 Hobas
Power Plant Milkow Poland 2016 500 10000 Hobas
Kemi, Efora Stora Enso Finland 2016 420 100 | 1200 | 1400 1 16000 Hobas

Data

Technical data

Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

References

Reference database

Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

Footprint

Our footprint

We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.