Retention System

LinkCountryYearTotal Length [m]Nominal Diameter DN [mm]Nominal Pressure PN [bar]Nominal Stiffness SN [N/m2]TechnologyPDF
Dieppe (76) / Réhabilitation du réseau ovoïde d’eaux pluviales situé sous le Cours de Dakar à l’aide de tuyaux NC France 2019-2020 1000 Non-Circular | 1000 1 Amiblu
Ostrava – Zeppelin – kanalizace Czech Republic 2019 18 1200 1 10000 Hobas
Retention system DN 3000 Oed Öhling Austria 2019 40 3000 1 10000 Hobas
Aytos Retention Tank Bulgaria 2019 2400 1 10000 Hobas
Kežmarok Slovakia 2019 102 1000 1 10000 Hobas
GFK-Löschwasserbehälter Germany 2019 48 2400 1 5000 Flowtite
Stauraumkanal Uniklinik Köln Germany 2019 36 1600 | 1800 | 2000 1 Flowtite
Stauraumkanal Pyrbaum Germany 2019 180 1400 1 Flowtite
Stauraumkanal mit Drachenprofil Germany 2019 50 2300 1 10000 Flowtite
Stauraumkanal Windhagen Germany 2019 550 2400 1 5000 Flowtite
Regenwasserkanal Eutin Am Rosengarten Germany 2019 108 700 1 10000 Hobas
Frankfurt/Oder Umbau Abwasser-Pumpwerk Lillihof Mischwasser Germany 2019 37 2200 | 2600 1 5000 Flowtite
Frankfurt a. Main Mischwasserkanal Flüssigboden Germany 2017 76 2400 1 10000 Hobas
Staukanal Friedrichsdorf, Landgraf-Friedrich-Str. Germany 2019 40 2600 1 10000 Flowtite
Fulda Staukanal Heidelsteinstr. Germany 2012 55 3000 1 10000 Hobas
Gießen Staukanal JLU Gelände Germany 2016 284 2400 1 10000 Hobas
Hanau Erschließung Pioneer Kaserne 1. BA Germany 2019 3294 300 | 1400 1 10000 Hobas
Hanau, Staukanal, Karl Brodrückstr. Germany 2015 58 2400 1 10000 Hobas
Bad Sobernheim GFK-Stauraumkanal 1150 m³ Germany 2020 254 2400 1 2500 Flowtite
GRP pipes help modernize combined sewer system in France France 2019 87 2400 | 3000 1 5000 Flowtite Hobas
Bergingsvoorziening Enschede Netherlands 2018 794 2500 | 2290 | 500 | 600 1 | 1 | 1 | 1 10000 | 10000 | 10000 | 10000 Flowtite
Dobroslavice – kanalizace – retence Czech Republic 2018 102 800 | 2400 1 | 1 10000 | 10000 Hobas
Havířov – Prostřední Suchá – retence Czech Republic 2018 50 2000 1 10000 Hobas
Dubrovnik, Airport Croatia 2018 1200 400 | 500 | 600 | 2000 1 15000 Hobas
XL Hobas GRP storage tank installed in Austria Austria 2018 880 3000 | 1000 | 200 Hobas
AVBN Transportkanal Ost BA 10 Stauraumkanal/Storage Sewer, DA Austria 2017 15 1400 1 10000 Hobas
Nitra Jaguar Land Rower Slovakia 2017 1250 1800 | 1700 1 | 1 10000 | 10000 Hobas
Warszawa, ul.Posagu 7 Panien Poland 2017 42 350 | 400 16 20000 Hobas
Rejowiec baza paliw Poland 2017 702 200 1 10000 Hobas
Kopalnia Bełchatow PGE Poland 2017 714 400 1 64000 Hobas

Data

Technical data

Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

References

Reference database

Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

Footprint

Our footprint

We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.