Special Applications

LinkCountryYearTotal Length [m]Nominal Diameter DN [mm]Nominal Pressure PN [bar]Nominal Stiffness SN [N/m2]TechnologyPDF
New wastewater treatment plant for Beirolas Portugal 2019 800 | 1200 | 1800 6 5000 Flowtite
Slavkov u Brna, ČOV Czech Republic 2019 9 1000 1 10000 Hobas
Šmarješke toplice Slovenia 2019 1944 300 | 200 | 1000 1 10000 | 5000 Flowtite
Ljubljana Aglomeracija in sočasna gradnja Slovenia 2019 23630 500 | 400 | 250 1 10000 | 5000 Flowtite
Ljubljana CO-kolektor Slovenia 2019 2640 1200 | 1000 1 10000 | 5000 Hobas
Izola Kolektor Slovenia 2019 2392 300 | 800 | 1000 1 10000 Hobas
Kočevje Željne Slovenia 2019 1086 1000 | 900 | 700 | 600 1 10000 | 500 Flowtite
Ljubljana Ikea Slovenia 2019 720 1200 | 1000 1 10000 Hobas
Ljubljana Šmartinka Slovenia 2019 408 800 | 700 | 1000 10000 | 5000 Flowtite
Krásno nad Kysucou Slovakia 2019 83 200 | 400 1 | 1 10000 | 10000 Hobas
Abwasserleitung Tübingen, Kläranlage Germany 2019 16 800 1 10000 Hobas
RWZI Weert Netherlands 2019 340 1000 | 900 1 | 1 10000 | 10000 Hobas
vervangen persleiding Beuningen Netherlands 2019 253 500 | 600 6 | 6 5000 | 5000 Hobas
Influentleiding RWZI Almelo Netherlands 2019 184 700 10 10000 Flowtite
RWZI Hengelo Netherlands 2018 350 700 6 10000 Flowtite
Persleiding AWP 2.0 Netherlands 2018 3400 1500 6 10000 Flowtite
prioritaire dijkversterking perceel 1 Bergen Netherlands 2018 828 500 | 300 6 | 6 10000 | 10000 Hobas
Lyondell wastewater treatment Netherlands 2018 324 350 | 250 1 | 1 10000 | 10000 Hobas
Rohožník Slovakia 2018 54 250 | 300 1 | 1 10000 | 10000 Hobas
Hobas GRP pipes for project Hranice – ČOV a kanalizace Czech Republic 2017 55 400 | 600 | 700 | 800 1 | 1 | 1 | 1 5000 | 10000 | 10000 | 10000 Hobas
Hobas GRP pipes for project Nový Jičín – ČOV a kanalizace Czech Republic 2017 71 300 | 500 1 10000 Hobas
Hobas GRP pipes for project Polička ČOV a kanalizace Czech Republic 2017 65 600 1 5000 Hobas
Hobas GRP pipes for WWTP Glina Project Romania 2017 220 2999 1 10000 Hobas
Sebedražie Slovakia 2017 231 500 | 300 1 | 1 10000 | 10000 Hobas
Modernizacja OŚ KWB Turów Bogatynia Poland 2017 61 800 | 1000 | 1200 1 10000 Hobas
Äänekoski, MF BTT Teravaniemi PN6 WWTP Finland 2017 80 300 | 600 6 10000 Hobas
Garwolin Oczyszczalnia Ścieków Poland 2017 152 250 | 500 6 10000 Hobas
Kaliningrad Oblast, Gvardeisk, WSTP Russia 2017 48 500 6 5000 Hobas
Złotoryja OŚ Poland 2017 420 800 | 800 | 600 | 1000 1 | 1 | 1 | 1 20000 | 10000 | 10000 | 10000 Flowtite
Leszno Kolektor Wschodni Poland 2017 570 2000 1 10000 Flowtite

Data

Technical data

Diameter, pressure, stiffness, and so much more… All the technical hard facts you need to plan, lay, and operate our pipelines.

References

Reference database

Over 30,000 projects in over 125 countries in over 60 years: Discover spectacular and technically challenging construction works with Amiblu’s technologies (Flowtite, Hobas, Amiblu, Amiscreen) in our reference database.

Footprint

Our footprint

We aim to have life cycle assessments for all products by end of 2022 and a carbon-neutral pipe production by 2030. We use the resources we have—our business, our voice, and our network—to fight the climate crisis and inspire people around the globe to value water as we should.