Amiscreen Staukanal Schnellgrabenbrücke 48 m³
PROJECT DETAILS
| Country: | Germany |
| City: | Rostock |
| Year: | 2018 |
| Application: | Retention System, Drainage |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 13 m |
| Nominal Diameter DN: | 2500 mm |
| Nominal Pressure PN: | 1 bar |
| Contractor: | ASA-Bau GmbH |
| Client: | Nordwasser GmbH Rostock |
