Barlinek – Kanalizacja deszczowa ul. Chopina i Orzeszkowej ( górny taras)
PROJECT DETAILS
| Country: | Poland |
| City: | Barlinek |
| Year: | 2023 |
| Application: | Retention System, Drainage |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 500 m |
| Nominal Diameter DN: | 200 | 400 mm |
| Nominal Pressure PN: | 1 | 1 bar |
| Nominal Stiffness SN: | 10 | 10 N/m2 |
