Bridge drainage in Barberino del Mugello (Firenze)
PROJECT DETAILS
| Project ID: [6135] | |
| Country: | Italy |
| City: | Barberino del Mugello (FI) |
| Year: | 2014 |
| Application: | Drainage |
| Installation: | Above Ground |
| Technology: | Hobas |
| Total Length: | 498 m |
| Nominal Diameter DN: | 150 | 400 | 500 mm |
| Nominal Pressure PN: | 1 bar |
| Nominal Stiffness SN: | 10000 N/m2 |


