Central Hidroeléctrica de Calheta
PROJECT DETAILS
| Project ID: [35611] | |
| Country: | Portugal |
| City: | Sacavem (Louro) |
| Year: | 2019 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 395 m |
| Nominal Diameter DN: | 800 | 1000 | 1500 mm |
| Nominal Pressure PN: | 10 bar |
| Nominal Stiffness SN: | 5000 | 10000 N/m2 |
| Client: | GRUPO AFAVIAS |

