Centrale S. Rufina Bugnara (AQ)
PROJECT DETAILS
| Project ID: [35261] | |
| Country: | Italy |
| City: | Torre de Nolfi |
| Year: | 2019 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 2159 m |
| Nominal Diameter DN: | 1800 mm |
| Nominal Pressure PN: | 6 bar |
| Nominal Stiffness SN: | 5000 N/m2 |
| Client: | Nuova Elettromecanica Adriatica |
