Centralina Riofreddo Polo di Arsiero (VI)
PROJECT DETAILS
| Country: | Italy |
| City: | Santorso |
| Year: | 2020 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 429 m |
| Nominal Diameter DN: | 600 mm |
| Nominal Pressure PN: | 10 bar |
| Nominal Stiffness SN: | 10000 N/m2 |
| Contractor: | IDROELETTRICA PREALPINA S.R.L. |
