Chichaoua – Hydro-agricultural development of Assif Al Mal perimeter – Lot 2: Pipeline from PM 339 to PM 6048 and regulation structure (OB2)
PROJECT DETAILS
Country: | Morocco |
City: | Chichaoua |
Year: | 2012 |
Application: | Irrigation |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 5236 m |
Nominal Diameter DN: | 1100 mm |
Nominal Pressure PN: | 12 bar |
Nominal Stiffness SN: | 2500 N/m2 |
Contractor: | STAM |