Chichaoua – Hydro-agricultural development of Assif Al Mal perimeter – Lot 2: Pipeline from PM 339 to PM 6048 and regulation structure (OB2)
PROJECT DETAILS
| Country: | Morocco |
| City: | Chichaoua |
| Year: | 2012 |
| Application: | Irrigation |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 5236 m |
| Nominal Diameter DN: | 1100 mm |
| Nominal Pressure PN: | 12 bar |
| Nominal Stiffness SN: | 2500 N/m2 |
| Contractor: | STAM |