Civil works, supply, transport and installation of pipelines and equipment for irrigation distribution network – Sectors M10–M18 & downstream line A5 – Lot 1
PROJECT DETAILS
| Country: | Morocco |
| City: | Tadla |
| Year: | 2016 |
| Application: | Irrigation |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 46629 m |
| Nominal Diameter DN: | 400 | 700 mm |
| Nominal Pressure PN: | 10 bar |
| Nominal Stiffness SN: | 5000 N/m2 |
| Contractor: | STAM |
