Collegamento Temo-Cuga condotta sul rio Sette Orta
PROJECT DETAILS
| Project ID: [22738] | |
| Country: | Spain |
| City: | Sardegna (Italy) |
| Year: | 2009 |
| Application: | Raw Water |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 3065 m |
| Nominal Diameter DN: | 1600 | 1600 mm |
| Nominal Pressure PN: | 10 | 10 bar |
| Nominal Stiffness SN: | 5000 | 5000 N/m2 |
| Consultant: | ENG. FRANCESCO PAOLO NACCARI, |
| Contractor: | COSEDIL, SPA |
| Client: | CONSORZIO DI BONIFICA DELLA NURRA |


