Collettore Galdovere: Travagliato – Torbole Casaglia
PROJECT DETAILS
| Country: | Italy |
| City: | Torbole Casaglia |
| Year: | 2021 |
| Application: | Sewer |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 3047 m |
| Nominal Diameter DN: | 500 mm |
| Nominal Pressure PN: | 1 bar |
| Nominal Stiffness SN: | 15000 N/m2 |
| Contractor: | SIDERIDRAULIC SYSTEM SpA |
| Client: | SIDERIDRAULIC SYSTEM SpA |
