Construction of 2nd downstream section of the supply pipeline for BOUHOUDA perimeter
PROJECT DETAILS
| Country: | Morocco |
| City: | Taounate |
| Year: | 2011 |
| Application: | Irrigation |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 6011 m |
| Nominal Diameter DN: | 1600 mm |
| Nominal Pressure PN: | 10 bar |
| Nominal Stiffness SN: | 5000 N/m2 |
| Contractor: | STAM |
