Construction of third distribution network section up to hydrant heads – Irrigation development & climate change adaptation project
PROJECT DETAILS
| Country: | Morocco |
| City: | Tafilalet |
| Year: | 2022 |
| Application: | Irrigation |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 18100 m |
| Nominal Diameter DN: | 300 | 800 mm |
| Nominal Pressure PN: | 10 | 16 bar |
| Nominal Stiffness SN: | 5000 N/m2 |
| Contractor: | CAPEP |
