Construction of third distribution network section up to hydrant heads – Irrigation development & climate change adaptation project
PROJECT DETAILS
Country: | Morocco |
City: | Tafilalet |
Year: | 2022 |
Application: | Irrigation |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 18100 m |
Nominal Diameter DN: | 300 | 800 mm |
Nominal Pressure PN: | 10 | 16 bar |
Nominal Stiffness SN: | 5000 N/m2 |
Contractor: | CAPEP |