Dąbrowa G. Strzemies
PROJECT DETAILS
| Country: | Poland |
| City: | Dąbrowa Górnicza |
| Year: | 2021 |
| Application: | Sewer |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 797 m |
| Nominal Diameter DN: | 1000 | 750 | 400 | 300 mm |
| Nominal Pressure PN: | 1 | 1 | 1 | 1 bar |
| Nominal Stiffness SN: | 10000 | 10000 | 10000 | 10000 N/m2 |
| Consultant: | Alfa Bożena Hebrajska |
| Contractor: | MZUM Dąbrowa |
| Client: | NEPTUN SP. Z O.O. |
