Dabrowa Górn. – Gołonóg Centrum Przesiadkowe
PROJECT DETAILS
| Country: | Poland |
| City: | Dąbrowa Górnicza |
| Year: | 2022 |
| Application: | Sewer, Manhole |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 72 m |
| Nominal Diameter DN: | 1800 mm |
| Nominal Pressure PN: | 1 bar |
| Nominal Stiffness SN: | 10000 N/m2 |
