Desaladora de Sant Boi
PROJECT DETAILS
| Project ID: [23224] | |
| Country: | Spain |
| City: | Sant Boi de Llobregat |
| Year: | 2009 |
| Application: | Desalination |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 394 m |
| Nominal Diameter DN: | 1000 | 1200 mm |
| Nominal Pressure PN: | 6 | 6 bar |
| Nominal Stiffness SN: | 5000 | 5000 N/m2 |
| Contractor: | UTE EDAR BAIX LLOBREGAT |
| Client: | Acuaebro |


