DG Centrum przesiadkowe
PROJECT DETAILS
| Country: | Poland |
| City: | Dąbrowa Górnicza |
| Year: | 2020-2021 |
| Application: | Sewer, Retention System |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 7750 m |
| Nominal Diameter DN: | 300 | 200 | 400 | 1700 mm |
| Nominal Pressure PN: | 1 | 1 | 1 | 1 bar |
| Nominal Stiffness SN: | 10000 | 10000 | 10000 | 10000 N/m2 |
| Consultant: | Mosty Katowice |
| Contractor: | Drogopol |
| Client: | DROGOPOL |