Drøllstølsbekken kraftverk
PROJECT DETAILS
| Country: | Norway |
| City: | Eidfjord |
| Year: | 2022 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 1560 m |
| Nominal Diameter DN: | 1000 | 1100 mm |
| Nominal Pressure PN: | 6 | 10 | 16 | 25 bar |
| Nominal Stiffness SN: | 5000 N/m2 |
| Consultant: | Norconsult AS |
| Contractor: | Gravin Maskinstasjon AS |
| Client: | Clemens kraft |
