EGYPT PROJECT, EGYPT
PROJECT DETAILS
| Project ID: [33493] | |
| Country: | Egypt |
| Year: | 1992 |
| Application: | Potable Water |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 40000 m |
| Nominal Diameter DN: | 600 | 600 mm |
| Contractor: | SAUDI IND. EXPORT |
© Amiblu Holding GmbH, 2025

How much pipe is used for the world’s largest desalination plant?