Gdynia Kładka
PROJECT DETAILS
| Project ID: [23109] | |
| Country: | Poland |
| City: | Gdynia |
| Year: | 2009 |
| Application: | Drainage |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 54 m |
| Nominal Diameter DN: | 200 | 300 mm |
| Nominal Pressure PN: | 1 | 1 bar |
| Consultant: | Transprojekt Gdański |
| Contractor: | Kolanko |
| Client: | UM Gdynia |


