Gelmes Oil Field
PROJECT DETAILS
| Project ID: [31732] | |
| Country: | Turkmenistan |
| City: | Gotur-Depe |
| Year: | 2000 |
| Application: | Chemical Industry |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 37800 m |
| Nominal Diameter DN: | 300 | 300 mm |
| Nominal Pressure PN: | 25 | 25 bar |
| Nominal Stiffness SN: | 10000 | 10000 N/m2 |
| Contractor: | AFIL |
| Client: | Turkmenneft |


