Gisslarbo kraftstation
PROJECT DETAILS
| Project ID: [21812] | |
| Country: | Sweden |
| City: | kolsva |
| Year: | 2011 |
| Application: | Hydropower |
| Installation: | Open Trench |
| Technology: | Flowtite |
| Total Length: | 396 m |
| Nominal Diameter DN: | 1800 | 1800 mm |
| Nominal Pressure PN: | 6 | 6 bar |
| Nominal Stiffness SN: | 5000 | 5000 N/m2 |
| Consultant: | Hultet Hydro Consult |
| Contractor: | Svevia |
| Client: | Malarenergi Vattenkraft AB |


