Grote kruising Krimpen a/d Ijssel
PROJECT DETAILS
| Project ID: [35563] | |
| Country: | Netherlands |
| City: | Krimpen a/d Ijssel |
| Year: | 2019 |
| Application: | Drainage |
| Installation: | Open Trench |
| Technology: | Hobas |
| Total Length: | 68 m |
| Nominal Diameter DN: | 1000 mm |
| Nominal Pressure PN: | 1 bar |
| Nominal Stiffness SN: | 20000 N/m2 |
| Consultant: | IBKW Krimpenerwaard |
| Contractor: | IBKW Krimpenerwaard |
| Client: | Gemeente krimpen aan de IJssel |
